Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Cost estimate <br />Site: Silt Pit Permit Action: TR06 SJM <br />PROJECT IDENTIFICATION <br />Task #: SJM State: Colorado <br />Date: 8/23/2017 County: Garfield <br />User: SJM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: M1981202SG <br />Abbreviation: None <br />Filename: M202-SJM <br />Task <br />Form <br />Descri tion Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />Ola <br />02a <br />03a <br />03b <br />04a <br />05a <br />05b <br />06a <br />07a <br />07b <br />Demo of cement and remove debris DEMOLISH <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />16.00 <br />$8,633.01 <br />$133,909.00 <br />$102,420.00 <br />$531.00 <br />$11,736.00 <br />$72,336.00 <br />$336.00 <br />$88,078.00 <br />$6,247.00 <br />$1,520.00 <br />Dewatering east lake to allow grading PUMPING <br />1,489.53 <br />Transport backfill material TRUCKI <br />116.75 <br />Grading of slopes DOZER <br />2.31 <br />Rip compacted areas RIPPER <br />47.43 <br />Transport half of topsoil TRUCKI <br />82.46 <br />Grade half of topsoil DOZER <br />1.46 <br />Reveg all disturbed areas not to be pond REVEGE <br />65.00 <br />Initial mobilization MOBILIZE <br />2.65 <br />Initial mobilization MOBILIZE <br />2.65 <br />SUBTOTALS: <br />1826.24 <br />$425,746 <br />INDIRECT COSTS <br />$0.00 <br />OVERHEAD AND PROFIT: <br />$0.00 <br />Liability insurance: <br />0.00 <br />Performance bond: <br />0.00 <br />Job superintendent: <br />0.00 <br />Profit: <br />10.00 <br />Total = <br />$0.00 <br />Total = <br />$0.00 <br />Total = <br />$0.00 <br />Total = <br />$42,574.60 <br />TOTAL O & P = <br />$42,574.60 <br />CONTRACT AMOUNT (direct + O & P) = <br />$468,320.60 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and/or administration: 0.00 <br />Total = 0.00 <br />Total = $0.00 <br />$0.00 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $42,574.60 <br />TOTAL BOND AMOUNT (direct + indirect) = $468,320.60 <br />