Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 07A <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: _ <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Roadable <br />Equipment <br />0.16 <br />0.16 <br />NA <br />NA <br />0.33 <br />Page 2 of 2 <br />RIFLE <br />9.00 miles <br />55.00 mph <br />$6,243.24 <br />$4.01 <br />Total job time: 2.65 Hours <br />Total job cost: $6,247 <br />CIRCES Cost Estimating Software <br />Non- <br />Roadable <br />Equipment <br />Haul Time (Hours): <br />0.16 <br />Return Time (Hours): <br />0.16_ <br />Loading Time (Hours): <br />0.50 <br />Unloading Time (Hours): <br />0.50 <br />Subtotals: <br />1.33 <br />JOB TBff AND COST <br />Roadable <br />Equipment <br />0.16 <br />0.16 <br />NA <br />NA <br />0.33 <br />Page 2 of 2 <br />RIFLE <br />9.00 miles <br />55.00 mph <br />$6,243.24 <br />$4.01 <br />Total job time: 2.65 Hours <br />Total job cost: $6,247 <br />CIRCES Cost Estimating Software <br />