Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 05B <br />BULLDOZER WORK <br />Task description: Grade half of topsoil <br />Site: Silt Pit Permit Action: TR06 SJM <br />PROJECT IDENTIFICATION <br />Task #: 05B State: Colorado <br />................... . <br />Date: 8/23/2017 County: Garfield <br />User: SJM <br />Agency or organization name: DBMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Page 1 of 2 <br />Permit/Job#: M1981202SG <br />Abbreviation: None <br />Filename: 05b <br />Total unit Cost/Hour: $229.67 <br />Total Fleet Cost/Hour: $229.67 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,000 <br />Swell factor: 1.215 <br />Loose volume: 2,430 LCY <br />Source of estimated volume: 71400 cy topsoil avalible per 2016 annual re ort <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />2,110.5 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0°0 <br />5,440 feet <br />1,600 lbs/LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor <br />Source <br />Utilization ° o <br />Ownership Cost/Hour: <br />$100.59 <br />NA <br />Operating Cost/Hour: <br />$87.23 <br />100 <br />Ripper own. <br />$0.00 <br />NA <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$41.85 <br />NA <br />Total unit Cost/Hour: $229.67 <br />Total Fleet Cost/Hour: $229.67 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,000 <br />Swell factor: 1.215 <br />Loose volume: 2,430 LCY <br />Source of estimated volume: 71400 cy topsoil avalible per 2016 annual re ort <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />2,110.5 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0°0 <br />5,440 feet <br />1,600 lbs/LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor <br />Source <br />