Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 03A Page 4 of 4 <br />Haul Rnute- <br />Seg # <br />Haul Distance Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />(fpm) <br />Time <br />Adjusted multiple truck/loader team production: 488.46 <br />LCY/Hour <br />Team(s) Total job time: 116.75 <br />min <br />1 <br />1000.00 0.00 <br />8.00 <br />8.00 <br />902 <br />1.157 <br />Haul Time: 1.157 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />183.47 LCY/Hour <br />(Ft) <br />3 Truck(s) <br />(%) <br />(%) <br />(fpm) <br />Time <br />Adjusted multiple truck/loader team production: 488.46 <br />LCY/Hour <br />Team(s) Total job time: 116.75 <br />Hours <br />/LCY Total job cost: $102,420 <br />min <br />1 <br />1000.00 <br />0.00 <br />8.00 <br />8.00 <br />1903 <br />0.619 <br />Loading Tool unit <br />Production 588.50 <br />Truck Unit Production <br />Optimal No. of Trucks: 3 <br />JOB TIME AND COST <br />Fleet size: I <br />Unit cost: $1.796 <br />Return Time: 0.619 <br />minutes <br />Total Truck Cycle Time: 4.446 <br />minutes <br />LCY/Hour Adjusted for job efficiency: <br />488.46 LCY/Hour <br />LCY/Hour Adjusted for job efficiency: <br />183.47 LCY/Hour <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 550.42 <br />LCY/Hour <br />Adjusted single truck/loader team production: 488.46 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 488.46 <br />LCY/Hour <br />Team(s) Total job time: 116.75 <br />Hours <br />/LCY Total job cost: $102,420 <br />CIRCES Cost Estimating Software <br />