Volume IX - GOB PILE #2
<br />Coal Mine
<br />APPENDIX A
<br />Waste Disposal Area
<br />Salvage Volumes
<br />_
<br />Coverfill Pile 2233 -
<br />Initial 50 Foot Bench _ - - 3.9,
<br />Second 50 Foot Bench - 7.7
<br />*Topsoil Topsoil
<br />Depth Ft. - CY
<br />- 1.22 4,453
<br />1.2 7,550
<br />1.2 14,907 - -
<br />- - -
<br />-
<br />_
<br />Third 50 Foot Bench _ 5.8
<br />Fourth 50 Foot Bench 2.91
<br />1.2 11,229
<br />1.25,614
<br />Top of Pile 2.3
<br />1.2 4,453
<br />Gob Pile #4 7.4
<br />0.58 6,924,
<br />Gob Pile #1 2.7
<br />0.5 2,178
<br />Gob #2 West Expansion 1.8
<br />1.21 3,485'
<br />Gob #2 Expansion-TR76 6.1
<br />1.2 11,810
<br />(Fill in Draw Between Pile #2 and #4)
<br />Area between gob #1"
<br />Topsoil Stockpile E 0.91
<br />__- 1
<br />1.2 1,742
<br />---
<br />Totals 43.80 _ 74,346i(Esbmaled ua/ue, notaaua/ymstndpde)
<br />Reclamation Volumes
<br />Area Topsoil Topsoil From Cover (Regd)i
<br />Acres
<br />Depth Ft.
<br />CY Stockpile
<br />CY
<br />Reclamation Areas
<br />Gob #4 (West Half) 4.83
<br />0.50
<br />3,896 3,89627,273
<br />First Bench Pile #2 4.41
<br />0.50
<br />3,557 3,557
<br />24,902,
<br />Second Bench Pile #2 5.10
<br />0.50 4,114 4,114
<br />28,798
<br />Third Bench Pile #2 7.45
<br />0.50 6,010 6,010
<br />42,068,
<br />Fourth Bench Pile #2 8.02.
<br />0.50 6,469 6,469
<br />45,286'
<br />Fifith Bench Pile #2 8.28
<br />0.50 6,679 6,679
<br />46,754
<br />Top of Pile Pile #2 7.39
<br />Coverfill 2.30
<br />gob Pile #1 _ _ _ _ 112
<br />Area between gob #1 & _ _ 0.9
<br />Topsoil Stockpile E
<br />- 0.50 - 5,961 5,961
<br />0.50 _ 1,855 1,855
<br />_ _ _ 0.50 903 903
<br />0.50 726 726
<br />_41,729
<br />_ n/a
<br />6,324 _
<br />n/a
<br />Total: 49.80,
<br />40,172 40,172
<br />263,135
<br />Coverfill Material Balance: - _- -
<br />Coverfill currently in -Place
<br />_ -_ --
<br />55,055
<br />Coverfill in stockpile, available for reclamation
<br />92,937
<br />Coverfill to be borrowed to complete reclamation
<br />115,143
<br />Total:
<br />263,135
<br />i In -Place
<br />Required
<br />Coverflll In -Place:
<br />Bench #1
<br />Gob #2 Benches 2/3/4
<br />Gob Pile #1
<br />-- -- - ----- - -- -
<br />Coverfill Available for reclamation:
<br />Amount
<br />CY
<br />24,902,
<br />_ 23,829
<br />6,324,
<br />Subtotal: 55,OStCoverfi//a/ia3dymplace(3.5'deptli)- -
<br />COVERFILL PILE -West
<br />35,000 In Stockpile
<br />Coverfill Pile -East
<br />44,537 In Stockpile
<br />Top of Gob Pile #4
<br />13,400
<br />Subtotal:
<br />92,937
<br />Coverfill Necessary to complete reclamation:
<br />TR -79 Excess Coverfill (to be salvaged)
<br />14,000 Calculated/Estimate Topsoil
<br />_
<br />From Gob Pile #3 Area (to be salvaged)
<br />58,943 Estimate
<br />Adjacent Borrow area #1 - Gob Pile #2 area
<br />7,200
<br />Adjacent Borrow area #2 - Gob Pile #2 area
<br />30,000
<br />Adjacent Borrow area #3 _ Gob Pile #2 area l
<br />- -- - Tota1
<br />5,000
<br />115.143
<br />-
<br />--
<br />---
<br />- - -�
<br />Topsoil
<br />In -Place;
<br />Volume Salvaged
<br />CY
<br />TOPSOIL PILED
<br />4,524 In -Place
<br />TOPSOIL PILE E
<br />37,948 In -Place
<br />Total:
<br />42472
<br />UNIFORM TOPSOIL DEPTH ASSUMED IN ORDER 70 MATCN QUA N 77TY 04L CUL 17E
<br />VALUESAREESUMATEDAND LIMYDIFFERENTFROMIN-FIELDCONDMOM
<br />PLEASESEEVOLUMEM 5=11= IRECLAMATION"FOR ADISMSSIONOFTHEML✓AC,Evs. ACTUAL TOPSOIL VALUES
<br />MR -162 App A-1 09/14
<br />
|