My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-24_PERMIT FILE - C1996083A (8)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2017-07-24_PERMIT FILE - C1996083A (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 5:52:04 PM
Creation date
8/23/2017 8:35:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/24/2017
Doc Name
TOC and Introduction
Section_Exhibit Name
Volume IX Coal Mine Waste Disposal Area No. 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Detailed Design <br />Design Parameters: <br />Type Coal Mine Waste Disposal Area <br />Original is Gob Pile No. 2 <br />West Expansion is also known as Gob Pile No. 4 <br />Capacity Original - 2,000,000 cubic yards <br />West Expansion (TR -44) - 500,000 cubic yards <br />West Expansion, upper bench (TR -72) - 65,000 CY <br />West & North Expansion (TR -76) - 600,000 CY <br />East & North Expansion (TR -98) - 135,000 CY <br />Slopes Original - No steeper than 3h:1v slopes with 15' wide <br />terraces on 50' intervals with the first 50 foot sloped no <br />steeper than 2.5h:1v. <br />West Expansion — Slopes between 2h:1v and 3h:1v with <br />15' wide terraces on 50' intervals with the first 50 foot sloped <br />no steeper than 2.5h:1v. All on a borrow (cut) slopes no <br />steeper than 2H:1 V. <br />West Expansion, upper bench - No steeper than 3h:1v <br />slopes. Will tie into existing Gob Pile on the upper bench. <br />West & North Expansion - No steeper than 3h:1v with 15' <br />wide terraces on 50' intervals and a 60' interval for the final <br />bench. The first 50' interval will be sloped no steeper than <br />2.5h:1v. <br />East & North Expansion - No steeper than 3h:1v with 15' <br />wide terraces on 50' intervals. <br />Terraces Slope 5% back towards the pile and 1.5 to 5% towards <br />collection ditches <br />Compaction 90 percent of the maximum dry density to prevent <br />spontaneous combustion and to provide the strength <br />required for stability of the refuse pile. Dry densities will be <br />determined in accordance with AASHTO T99-74. <br />TR -98 - 4 - 01/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.