My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-10_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2017-04-10_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 8:11:42 AM
Creation date
8/21/2017 7:08:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
4/10/2017
Doc Name
Pages EX13A-TO-1 to EX13A-T18B-2
Section_Exhibit Name
Exhibit 13A Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
477
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
125 <br />126 <br />127 <br />128 <br />129 <br />130 <br />131 <br />132 <br />133 <br />134 <br />135 <br />136 <br />137 <br />138 <br />139 <br />140 <br />141 <br />142 <br />143 <br />144 <br />145 <br />146 <br />147 <br />148 <br />149 <br />150 <br />160 <br />161 <br />162 <br />163 <br />165 <br />166 <br />167 <br />168 <br />169 <br />170 <br />171 <br />172 <br />173 <br />Haul Topsoil from Stockpile 15F to Facilities Area <br />TRUCKI <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1.03 <br />$6,999.00 <br />$24,027.00 <br />$47,762.00 <br />$8,376.00 <br />$2,221.00 <br />$74,788.00 <br />$56,088.00 <br />$4,674.00 <br />$3,797.00 <br />$2,469.00 <br />$3,987.00 <br />$475.00 <br />$1,424.00 <br />$2,753.00 <br />$570.00 <br />$3,418.00 <br />$664.00 <br />$3,608.00 <br />$4,367.00 <br />$1,614.00 <br />$475.00 <br />$2,943.00 <br />$2,373.00 <br />$2,373.00 <br />$2,373.00 <br />$104,371.00 <br />$205,119.28 <br />$26,097.87 <br />$4,085.89 <br />$3,515.45 <br />$150,249.00 <br />$36,474.00 <br />$200,942.00 <br />$622,391.00 <br />$161,388.00 <br />$94,193.00 <br />$478,703.00 <br />$161,388.00 <br />$234,058.00 <br />Haul Topsoil from Stockpile 15G to Facilities Area <br />TRUCKI <br />3.17 <br />Haul Topsoil from Stockpile 15H to Facilities Area <br />TRUCKI <br />7.06 <br />Haul Topsoil from Stockpile 15I to Facilities Area <br />TRUCKI <br />1.24 <br />Haul Topsoil from Stockpile Gossard Loadout <br />TRUCKI <br />0.33 <br />Replace 48" of Topsoil on Aspen Study Area <br />TRUCKI <br />9.86 <br />Replace 48" of Topsoil on Tall Mountain Shrub <br />Study Area <br />TRUCKI <br />7.40 <br />Replace 4" of Topsoil on Tall Mountain Shrub <br />Study Area <br />TRUCKI <br />0.62 <br />Replace Topsoil from Stockpile to Gulch A Pond <br />DOZER <br />14.13 <br />Replace Topsoil from Stockpile to Prospect Pond <br />DOZER <br />9.19 <br />Replace Topsoil from Stockpile to Streeter Pond <br />DOZER <br />14.84 <br />Replace Topsoil from Stockpile to Gossard Loop <br />Pond <br />DOZER <br />1.77 <br />Replace Topsoil from Stockpile to Gossard Pond <br />DOZER <br />5.30 <br />Replace Topsoil from Stockpile to Sewage and <br />Aeration Pond <br />DOZER <br />10.25 <br />Replace Topsoil from Stockpile to Stoker Siding <br />Pond <br />DOZER <br />2.12 <br />Replace Topsoil from Stockpile to Wash Bay Pond <br />DOZER <br />12.72 <br />Replace Topsoil from Stockpile to Wash Bay <br />Sediment Sum <br />DOZER <br />2.47 <br />Replace Topsoil from Stockpile to Work Area <br />Pond <br />DOZER <br />13.43 <br />Replace Topsoil from Stockpile to Section 16 Pond <br />DOZER <br />16.25 <br />Replace Topsoil from Stockpile to East Taylor <br />Pond <br />DOZER <br />6.01 <br />Replace Topsoil from Stockpile to Taylor Pond <br />DOZER <br />1.77 <br />Replace Topsoil from Stockpile to West Pit Pond <br />DOZER <br />10.95 <br />Replace Topsoil from Stockpile to Section 28 Pond <br />DOZER <br />8.83 <br />Replace Topsoil from Stockpile to Section 21 Pond <br />DOZER <br />8.83 <br />Replace Topsoil from Stockpile to West Taylor <br />Pond <br />DOZER <br />8.83 <br />Replace Topsoil from Stockpile to Collection <br />Ditches <br />EXCAVATE <br />679.71 <br />Plug and Seal All Wells and Boreholes <br />BOREHOLE <br />534.00 <br />Seal South Taylor In -Pit Exploration Holes <br />BOREHOLE <br />116.00 <br />Plug and Seal Three South Taylor Pit Exploration <br />Holes <br />BOREHOLE <br />12.00 <br />Plug and Seal 15 Geotechnical Holes <br />BOREHOLE <br />30.00 <br />Reseed East Pit with Grazing Land Seed Mix - <br />Active Pit Area <br />REVEGE <br />545.00 <br />Reseed East Pit P with Sagebrush Steppe Seed Mix <br />REVEGE <br />90.40 <br />Reseed East Pit with Grazing Land Seed Mix - <br />Phase II Areas <br />REVEGE <br />420.90 <br />Reseed West Pit with Grazing Land Seed Mix <br />REVEGE <br />2,257.60 <br />Reseed West Pit with Sagebrush Steppe Seed Mix <br />REVEGE <br />400.00 <br />Reseed Section 16 Pit with Grazing Land Seed <br />Mix - Phase 11 <br />REVEGE <br />394.60 <br />Reseed South Taylor Pit with Grazing Land Seed <br />Mix <br />REVEGE <br />1,736.40 <br />Reseed South Taylor Pit with Sagebrush Steppe <br />REVEGE <br />400.00 <br />tSeedixFacilities Area with Grazing Land Seed <br />REVEGE <br />849.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.