Laserfiche WebLink
PHOTOGRAPHS <br />Photo 1 - New toe drains recently installed at I Dam. <br />PERMIT #: M-1977-493 <br />INSPECTOR'S INITIALS: ECS <br />INSPECTION DATE: August 17, 20I7 <br />' �^1 . • f T ; - -fix <br />Photo 2 - New toe drains being installed at 1 Dam. <br />Photo 3 - Sludge cleanout underway at Warren's Pump <br />Station adjacent to Robinson Lake. <br />Photo 4 - Topsoil stockpile near south end of 3 -Dam. <br />Photo 5 - Stripping of topsoil and overburden from Photo 6 - Small unused steel shed near Mayflower acid <br />Mayflower TSF area. Tenmile TSF (3 -Dam) in background. pump station that will be removed this fall. <br />Page 3 of 3 <br />