Laserfiche WebLink
BOREHOLE SEALING WORK <br /> <br />Task description: Plug and Seal Drill Hole and Monitoring Wells <br />Site: Lorencito Canyon Mine Permit Action: RN4 Permit/Job#: C1996084 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 040 State: Colorado Abbreviation: None <br />Date: 8/17/2017 County: Las Animas Filename: C084-040 <br />User: CCW <br />Agency or organization name : DRMS <br /> <br />UNIT COSTS <br /> <br />Borehole <br />Description <br />Sealing/Item Method <br />Diameter <br /> <br />Length <br /> <br />Quantity <br /> <br />Unit <br /> Unit <br />Cost <br /> Total Cost <br />Plug and Seal 8" <br />Holes (1) <br />Portland cement grout ( <br />Bag, material cost <br />only...94 lb. bag) <br />8" 25 4.30 bag $10.55 $45.37 <br />Borehole Plug PVC plug - 8 in. <br />diameter borehole <br />8" NA 1.00 EA $74.16 $74.16 <br />Borehole Marker Borehole <br />location/identification <br />marker (EA, material <br />cost only) <br />NA NA 1.00 EA $3.67 $3.67 <br />Drill Rig and <br />Labor <br />SCHRAMM T145EX NA NA 1.00 EA $313.90 $313.90 <br />Water Truck Water Tanker, 2,500 <br />Gal. <br />NA NA 1.00 EA $44.01 $44.01 <br />Plug and Seal 6" <br />Holes (9) <br />Portland cement grout ( <br />Bag, material cost <br />only...94 lb. bag) <br />6" 209 20.00 bag $10.55 $211.00 <br />Borehole Plug PVC plug - 6 in. <br />diameter borehole <br />6" NA 9.00 EA $54.14 $487.26 <br />Borehole Marker Borehole <br />location/identification <br />marker (EA, material <br />cost only) <br />NA NA 9.00 EA $3.67 $33.03 <br />Drill Rig and <br />Labor <br />SCHRAMM T145EX NA NA 9.00 EA $313.90 $2,825.10 <br />Water Truck Water Tanker, 2,500 <br />Gal. <br />NA NA 9.00 EA $44.01 $396.09 <br />Seal All 4" Holes <br />(17) <br />Portland cement grout ( <br />Bag, material cost <br />only...94 lb. bag) <br />4" 4231 184.00 bag $10.55 $1,941.20 <br />Borehole Plug PVC plug - 4 in. <br />diameter borehole <br />4" NA 17.00 EA $29.95 $509.15 <br />Borehole Marker Borehole <br />location/identification <br />marker (EA, material <br />cost only) <br />NA NA 17.00 EA $3.67 $62.39 <br />Drill Rig and <br />Labor <br />SCHRAMM T145EX NA NA 17.00 EA $313.90 $5,336.30 <br />Water Truck Water Tanker, 2,500 <br />Gal. <br />NA NA 17.00 EA $44.01 $748.17 <br /> <br />Job Hours : 27.00 Total Cost: $13,031.00