Laserfiche WebLink
Truck/Loader Worksheet Cont’d Task # 030 Page 4 of 4 <br /> <br />CIRCES Cost Estimating Software <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time (min) <br />1 2800.00 -5.00 5.00 0.00 3569 1.108 <br />Haul Time: 1.108 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time (min) <br />1 2800.00 5.00 5.00 10.00 1819 1.621 <br />Return Time: 1.621 minutes <br />Total Truck Cycle Time: 6.279 minutes <br />Loading Tool unit <br />Production <br /> <br />964.29 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />800.36 <br /> <br />LCY/Hour <br />Truck Unit Production <br />376.25 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />312.29 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />3 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />3 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 936.87 LCY/Hour <br />Adjusted single truck/loader team production: 800.36 LCY/Hour <br />Adjusted multiple truck/loader team production: 800.36 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 1.27 Hours <br /> <br />Unit cost: <br /> <br />$1.897 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$1,920 <br />