Laserfiche WebLink
Page 1 of 3 <br /> <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br /> <br />Task description: Replace Topsoil from Stockpile BA#1 to Fill 7a <br />Site: Lorencito Canyon Mine Permit Action: RN4 Permit/Job#: C1996084 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado Abbreviation: None <br />Date: 8/16/2017 County: Las Animas Filename: C084-002 <br />User: CCW <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br />Truck Loader Team -Truck: Cat 773F <br />-Loader: CAT 990H high lift <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: Cat D9T - 9SU <br />Road Maintenance –Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br /> <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor <br />Grader <br />Water Truck <br />%Utilization -machine: 100 95 50 100 25 25 <br />Ownership cost/hour: $107.96 $126.84 $100.59 $100.59 $54.68 $24.01 <br />Operating cost/hour: $81.97 $112.27 $43.62 $87.23 $11.75 $8.53 <br />%Utilization -riper: NA 0 50 0 NA NA <br />Ripper o wn . cost/hour: NA $0.00 $10.94 $10.94 $0.00 $0.00 <br />Ripper op. cost/hour: NA $0.00 $3.41 $0.00 $0.00 $0.00 <br />Operator cost/hour: $31.17 $41.20 $41.85 $41.85 $28.90 $21.39 <br />Unit Subtotals: $221.10 $280.31 $189.46 $229.67 $95.33 $53.94 <br />Number of Units: 2 1 1 1 1 1 <br />Group Subtotals: Work: $722.51 Support: $419.13 Maint: $149.27 <br />Total work team cost/hour: $1,290.91 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 3,440 CCY Swell factor: 1.125 <br />Loose volume: 3,870 LCY <br />Source of estimated volume: Table 2.05.4-1f <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br /> <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br /> Material weight: 2,550 Pounds/LCY <br /> Description : Earth - Dry packed <br /> Rated Payload: 122,520 Pounds