Laserfiche WebLink
Truck/Loader Worksheet Cont’d Task # 006 Page 3 of 3 <br /> <br />CIRCES Cost Estimating Software <br />Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 2” tire <br />penetration 5.0 <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time (min) <br />1 1200.00 8.00 5.00 13.00 678 1.798 <br />Haul Time: 1.798 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 1200.00 -8.00 5.00 -3.00 3569 0.392 <br />Return Time: 0.392 minutes <br />Total Truck Cycle Time: 5.740 minutes <br />Loading Tool unit <br />Production <br /> <br />964.29 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />800.36 <br /> <br />LCY/Hour <br />Truck Unit Production <br />411.59 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />341.62 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 683.23 LCY/Hour <br />Adjusted single truck/loader team production: 683.23 LCY/Hour <br />Adjusted multiple truck/loader team production: 683.23 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 12.76 Hours <br /> <br />Unit cost: <br /> <br />$1.889 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$16,473 <br />