Laserfiche WebLink
Truck/Loader Worksheet Cont’d Task # 004 Page 3 of 3 <br /> <br />CIRCES Cost Estimating Software <br />Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 2” tire <br />penetration 5.0 <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time (min) <br />1 400.00 19.00 5.00 24.00 338 1.187 <br />Haul Time: 1.187 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 400.00 -19.00 5.00 -14.00 1377 0.403 <br />Return Time: 0.403 minutes <br />Total Truck Cycle Time: 5.140 minutes <br />Loading Tool unit <br />Production <br /> <br />964.29 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />800.36 <br /> <br />LCY/Hour <br />Truck Unit Production <br />459.63 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />381.49 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 762.99 LCY/Hour <br />Adjusted single truck/loader team production: 762.99 LCY/Hour <br />Adjusted multiple truck/loader team production: 762.99 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 13.00 Hours <br /> <br />Unit cost: <br /> <br />$1.692 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$16,788 <br />