Laserfiche WebLink
Mobilization Worksheet Cont’d Task # 072 Page 2 of 2 <br /> <br />CIRCES Cost Estimating Software <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: TRINIDAD <br />Total one-way travel distance: 20.00 miles <br />Average Travel Speed : 35.00 mph <br /> <br />Total Non -Roadable Mob/Demob Cost * <br />‘* two round trips with haul rig : $29,601.11 <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig : $74.16 <br /> <br />Transportation Cycle Time: <br /> Non - <br />Roadable <br />Equipment <br /> <br />Roadable <br />Equipment <br />Haul Time (Hours): 0.57 0.57 <br />Return Time (Hours): 0.57 0.57 <br />Loading Time (Hours): 0.50 NA <br />Unloading Time (Hours): 0.50 NA <br />Subtotals: 2.14 1.14 <br /> <br />JOB TIME AND COST <br /> <br /> Total job time: 4.29 Hours <br /> <br />Total job cost : <br /> <br />$29,675 <br />