Laserfiche WebLink
Truck/Loader Worksheet Cont’d Task # 060 Page 3 of 3 <br /> <br />CIRCES Cost Estimating Software <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time (min) <br />1 5000.00 5.00 5.00 10.00 1068 4.695 <br />Haul Time: 4.695 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time (min) <br />1 5000.00 -5.00 5.00 0.00 2938 1.727 <br />Return Time: 1.727 minutes <br />Total Truck Cycle Time: 9.937 minutes <br />Loading Tool unit <br />Production <br /> <br />272.24 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />225.96 <br /> <br />LCY/Hour <br />Truck Unit Production <br />71.64 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />59.46 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />4 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />4 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 237.85 LCY/Hour <br />Adjusted single truck/loader team production: 225.96 LCY/Hour <br />Adjusted multiple truck/loader team production: 225.96 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 122.42 Hours <br /> <br />Unit cost: <br /> <br />$2.396 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$66,278 <br />