My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-18_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2017-08-18_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2017 9:05:00 AM
Creation date
8/18/2017 11:14:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
8/18/2017
Doc Name
Reclamation Cost Estimate
From
Clayton Wein
To
Rob Zuber
Type & Sequence
RN4
Email Name
CCW
JRS
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br /> <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br /> <br />Task description: Clean Sediment Ponds at Mine Site <br />Site: Lorencito Canyon Mine Permit Action: RN4 Permit/Job#: C1996084 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 060 State: Colorado Abbreviation: None <br />Date: 8/17/2017 County: Las Animas Filename: C084-060 <br />User: CCW <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br />Truck Loader Team -Truck: Generic 10-12 cy, 6x4 <br />-Loader: Cat 324D L 9’-8” Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: Cat D8T - 8SU <br />Road Maintenance –Motor Grader: NA <br />-Water Truck: NA <br /> <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Excavator Load Area Dump Area Motor <br />Grader <br />Water Truck <br />%Utilization -machine: 100 100 NA 100 NA NA <br />Ownership cost/hour: $18.29 $38.54 NA $83.81 NA NA <br />Operating cost/hour: $39.97 $40.22 NA $66.17 NA NA <br />%Utilization -riper: NA 0 NA NA NA NA <br />Ripper o wn . cost/hour: NA $0.00 NA $0.00 NA NA <br />Ripper op. cost/hour: NA $0.00 NA $0.00 NA NA <br />Operator cost/hour: $0.00 $37.79 NA $41.85 NA NA <br />Unit Subtotals: $58.26 $116.55 NA $191.83 NA NA <br />Number of Units: 4 1 0 1 0 0 <br />Group Subtotals: Work: $349.59 Support: $191.83 Maint: $0.00 <br />Total work team cost/hour: $541.42 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 21,780 CCY Swell factor: 1.270 <br />Loose volume: 27,661 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br /> <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br /> Material weight: 2,700 Pounds/LCY <br /> Description : Earth - Wet excavated <br /> Rated Payload: 35,400 Pounds
The URL can be used to link to this page
Your browser does not support the video tag.