My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-16_GENERAL DOCUMENTS - C2010089
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010089
>
2017-08-16_GENERAL DOCUMENTS - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2017 7:04:15 AM
Creation date
8/18/2017 7:01:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
General Documents
Doc Date
8/16/2017
Doc Name Note
(RN1)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Permit Index Doc Type
Findings
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> 25 <br />The uppermost, unconsolidated overburden, which can generally be free-dug by the <br />shovel, will comprise the upper portions of the backfill. <br /> <br />Post-mining topography is shown on Map 2.05.4-1. The NHN permit area will be <br />returned to approximate original contour. The entire volume of spoil will be used to <br />backfill the areas mined, and the operator has not requested a modification of the general <br />requirements of 4.14.2 for reclamation to approximate original contour. No cut-and-fill <br />terraces have been proposed or approved. <br /> <br />XI. Revegetation <br /> <br />Information regarding baseline vegetation studies may be found in Section 2.04.10 of the <br />permit application. Information regarding revegetation of disturbed areas may be found <br />in Section 2.05.4(2)(e) of the permit application. The goal of revegetation efforts at the <br />New Horizon North Mine is to establish postmining land uses of Intensely Managed <br />Irrigated Pasture, Irrigated Pasture and Dryland Pasture. Some areas that had an Irrigated <br />Pasture pre-mine land use will be reclaimed as Dryland Pasture due to lack of irrigation <br />water availability at the time of reclamation. Letters of consent by the present <br />landowners are included in Appendix 2.05.5-1. <br /> <br />A. The Division proposes to approve the use of introduced species in the reclamation <br />seed mix. The applicant has submitted information which shows that the introduced <br />species are desirable and necessary to achieve the approved post mining land use, and <br />are not poisonous or noxious (Section 4.15.2(3)). <br /> <br />Seed mixes number 2 and 3 are temporary seed mixes. Mix #2 is for areas less than <br />one year until the permanent mix will be planted and Mix #3 is for longer term <br />temporary plantings such as topsoil stockpiles. The introduced species in these mixes <br />will facilitate site stabilization and provide organic matter when incorporated into the <br />topsoil prior to permanent seeding. <br /> <br />Seed mix numbers 5, 6 and 7 are for the reclaimed irrigated pastureland; the mix is <br />determined by moisture availability. All species in these mixes are introduced and <br />were selected as beneficial for grazing purposes as discussed in Section 2.05.4(2)(e). <br />The irrigated pasture mixes are seeded in the spring along with a companion crop of <br />oats or barley. <br /> <br />Seed mix #8 is for the dryland pasture and consists of introduced species that are <br />drought tolerant, provide site stabilization and have utility for wildlife and livestock. <br />This seed mix was reviewed and approved by the NRCS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.