My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-16_GENERAL DOCUMENTS - C2010089
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010089
>
2017-08-16_GENERAL DOCUMENTS - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2017 7:04:15 AM
Creation date
8/18/2017 7:01:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
General Documents
Doc Date
8/16/2017
Doc Name Note
(RN1)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Permit Index Doc Type
Findings
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> 21 <br /> <br />Other than the three sedimentation ponds, no impoundments are proposed for <br />construction in conjunction with the NHN operation (4.05.9). <br /> <br /> G. Surface and Ground Water Monitoring <br /> <br />ERMR has established a surface water and groundwater monitoring program that will <br />gather baseline and operational water quantity and water quality data in order to <br />monitor the effects of the proposed mining operation on the surface and subsurface <br />water which is within or adjacent to the permit area. The Hydrologic Monitoring Plan <br />is described in Section 2.05.6(3)(b)(iv) of the permit document. <br /> <br />1. The groundwater monitoring plan is included in Appendix 2.05.6(3)-3 and the <br />field and laboratory parameters to be analyzed are provided in Tables 1 and 3 of <br />that section. ERMR established baseline data for twelve shallow bedrock wells <br />identified as GW-N47 through GW-N58. The monitoring well locations are <br />shown on Map 2.04.7-1 in Section 2.04.7 Hydrology Description. ERMR <br />sampled and analyzed for field and full suite laboratory parameters starting in <br />October 2008 and has continued collecting monthly field and quarterly full suite <br />samples since that time to establish the baseline data. These wells GW-N47 <br />through GW-N58 will continue to be monitored according to the plan given in <br />Appendix 2.05.6(3)-3. No alluvial groundwater monitoring is proposed for the <br />site. No alluvial wells were installed due to the lack of alluvium within the <br />permit area. <br /> <br />2. The surface water monitoring plan is discussed in Section 2.05.6(3)(b)(v) of the <br />permit. The list of parameters to be analyzed is located in Appendix 2.04.7 -2. <br />The monitoring plan will be used to identify any trends in water quality or <br />quantity that would indicate any negative impact from the proposed mining and <br />reclamation operations. The monitoring plan was submitted under <br />2.05.6(3)(b)(iv) and includes the following (4.05.13(2)): <br /> <br />Site <br />Name Location Frequency Parameters <br />SW- <br />N200 <br />Downstream 2nd Park Lateral <br />at 26 Road CC Ditch <br />Crossing <br />Monthly field parameters, <br />bi-monthly lab analysis <br />Appendix Table <br />2.04.7-2 <br />SW- <br />N201 <br />Downstream 2nd Park <br />Sublateral Tailwater near <br />Garvey House <br />Monthly field parameters, <br />bi-monthly lab analysis <br />Appendix Table <br />2.04.7-2 <br />SW- <br />N202 Downstream Meehan Draw Monthly field parameters, <br />bi-monthly lab analysis <br />Appendix Table <br />2.04.7-2 <br />SW- <br />N203 Downstream Glasier Draw Monthly field parameters, <br />bi-monthly lab analysis <br />Appendix Table <br />2.04.7-2 <br />SW- <br />N204 Upstream Glasier Draw Monthly field parameters, <br />bi-monthly lab analysis <br />Appendix Table <br />2.04.7-2
The URL can be used to link to this page
Your browser does not support the video tag.