My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-16_GENERAL DOCUMENTS - C2010089
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010089
>
2017-08-16_GENERAL DOCUMENTS - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2017 7:04:15 AM
Creation date
8/18/2017 7:01:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
General Documents
Doc Date
8/16/2017
Doc Name Note
(RN1)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Permit Index Doc Type
Findings
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> 14 <br />Haul roads, as shown on Map 2.05.3(3)-3, were constructed within the disturbed area. Removal <br />of the coal resource commenced in 2013 and is approved through 2020 (NHN notified the Division <br />on June 8, 2017 that coal extraction had ceased until further notice). The primary coal seam to be <br />recovered is the Lower Dakota seam. The Upper Dakota seam will be recovered if it is thick <br />enough and of sufficient quality. The rate of coal production, which supplies Tri-State Generating <br />and Transmission Association's Nucla Station, is approved to be 250,000 to 460,000 tons per year. <br />For the years 2014 – 2016, the production averaged 236,565 tons per year. Coal is transported to <br />the plant by contracted haulage trucks over a network of Montrose County roads. <br /> <br />Reclamation Plan <br /> <br />Reclamation activities occur concurrently with mining. The Division proposes to re-approve an <br />extension to the 180-day requirement for completion of backfill and grading based on equipment <br />and manpower availability. This extension was originally approved with MR-20 on July 10, 2017. <br />The backfill and grading timeline is outlined in Table 2.05.4(2)(a)-1 of the permit. A typical <br />diagram illustrating the mining and backfill process is provided in Map 2.05.3-1 of the permit. <br />Following backfilling and grading, topsoil is redistributed to the thicknesses shown on Map <br />2.05.4(2)(d)-1. The type and thickness of topsoil is related to the post-mining land use. Replaced <br />soils are prepared for seeding as described in Sections 2.05.4(2)(d) and (e) of the permit. The <br />reclaimed lands will be capable of supporting the same uses that were present prior to disturbance. <br /> <br />Water rights and usage <br /> <br />ERMR owns several water rights which are detailed in Table 1 of Appendix 2.05.6(3)-1b of the <br />permit. The water will be used for irrigation, industrial and storage. The approved water <br />augmentation plan is in Appendix 2.05.6(3)-1c of the permit. <br /> <br />All the wells within a 1-mile radius of NHN permit area are listed on Table 2.04.7-4 in Section <br />2.04.7 of the permit. The approved NHN well permits are listed in Appendix 2.05.6(3)-4 of the <br />permit. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.