Laserfiche WebLink
<br /> <br /> <br /> 30 <br /> <br />XVI. Concurrent Surface and Underground Mining <br /> <br />No underground mining is proposed for New Horizon North Mine. <br /> <br />XVII. Operations on Alluvial Valley Floors <br /> <br />The Division has made a negative determination for the existence of alluvial valley <br />floors within the NHN permit area based on Rule 2 .06.8(3)(c) and (2 .07.6(2)(k). <br /> <br />XVIII. Operations on Prime Farmland <br /> <br />The Division has made a negative determination for the presence of prime farmland <br />within the NHN permit area (Section 2 . 04 .12). <br /> <br />XIX. Mountaintop Removal <br /> <br />The standards of 4.26 do not apply to the New Horizon North Mine. <br /> <br />XX. Operations on Steep Slopes <br /> <br />The standards of 4.27 do not apply to the New Horizon North Mine. <br /> <br />XXI. In Situ Processing <br /> <br />In situ processing is not proposed or approved for the New Horizon North <br />Mine. <br />