My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-16_REVISION - C2010089 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2017-08-16_REVISION - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2017 7:04:15 AM
Creation date
8/17/2017 10:11:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
8/16/2017
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
RN1
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> 14 <br />Haul roads, as shown on Map 2.05.3(3)-3, were constructed within the disturbed area. Removal <br />of the coal resource commenced in 2013 and is approved through 2020 (NHN notified the Division <br />on June 8, 2017 that coal extraction had ceased until further notice). The primary coal seam to be <br />recovered is the Lower Dakota seam. The Upper Dakota seam will be recovered if it is thick <br />enough and of sufficient quality. The rate of coal production, which supplies Tri-State Generating <br />and Transmission Association's Nucla Station, is approved to be 250,000 to 460,000 tons per year. <br />For the years 2014 – 2016, the production averaged 236,565 tons per year. Coal is transported to <br />the plant by contracted haulage trucks over a network of Montrose County roads. <br /> <br />Reclamation Plan <br /> <br />Reclamation activities occur concurrently with mining. The Division proposes to re-approve an <br />extension to the 180-day requirement for completion of backfill and grading based on equipment <br />and manpower availability. This extension was originally approved with MR-20 on July 10, 2017. <br />The backfill and grading timeline is outlined in Table 2.05.4(2)(a)-1 of the permit. A typical <br />diagram illustrating the mining and backfill process is provided in Map 2.05.3-1 of the permit. <br />Following backfilling and grading, topsoil is redistributed to the thicknesses shown on Map <br />2.05.4(2)(d)-1. The type and thickness of topsoil is related to the post-mining land use. Replaced <br />soils are prepared for seeding as described in Sections 2.05.4(2)(d) and (e) of the permit. The <br />reclaimed lands will be capable of supporting the same uses that were present prior to disturbance. <br /> <br />Water rights and usage <br /> <br />ERMR owns several water rights which are detailed in Table 1 of Appendix 2.05.6(3)-1b of the <br />permit. The water will be used for irrigation, industrial and storage. The approved water <br />augmentation plan is in Appendix 2.05.6(3)-1c of the permit. <br /> <br />All the wells within a 1-mile radius of NHN permit area are listed on Table 2.04.7-4 in Section <br />2.04.7 of the permit. The approved NHN well permits are listed in Appendix 2.05.6(3)-4 of the <br />permit. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.