Laserfiche WebLink
222 <br />223 <br />230 <br />231 <br />232 <br />233 <br />234 <br />235 <br />236 <br />237 <br />238 <br />239 <br />240 <br />241 <br />401 <br />402 <br />403 <br />404 <br />405 <br />406 <br />407 <br />408 <br />409 <br />410 <br />411 <br />412 <br />413 <br />414 <br />415 <br />416 <br />417 <br />418 <br />419 <br />420 <br />421 <br />422 <br />423 <br />424 <br />425 <br />426 <br />427 <br />428 <br />429 <br />430 <br />Mobilize/Demobilize Equipment for Yearly Site MOBILIZE <br />Maintenance <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />3 <br />2 <br />2 <br />2 <br />2 <br />3 <br />1 <br />2 <br />4 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />1 <br />2 <br />4 <br />4 <br />3 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />4 <br />1 <br />1 <br />12.22 <br />$73,359.00 <br />$6,608.00 <br />$510,456.00 <br />$26,648.00 <br />$238,328.00 <br />$221.00 <br />$218.00 <br />$178.00 <br />$126.00 <br />$131.00 <br />$276.00 <br />$1,256.00 <br />$645.00 <br />$329,914.00 <br />$644,516.00 <br />$159,626.00 <br />$79,120.00 <br />$265,834.00 <br />$704,490.00 <br />$322,741.00 <br />$29,363.00 <br />$237,387.00 <br />$604,188.00 <br />$186,474.00 <br />$47,771.00 <br />$24,732.00 <br />$136,275.00 <br />$58,276.00 <br />$60,531.00 <br />$11,870.00 <br />$1,665,876.44 <br />$119,041.00 <br />$386,258.00 <br />$1,147,285.00 <br />$787,014.00 <br />$248,568.00 <br />$958,915.00 <br />$67,708.00 <br />$9,769.00 <br />$801.00 <br />$6,388.00 <br />$618,456.00 <br />$614.00 <br />$225.00 <br />Mobilize/Demobilize Equipment for Two Pond MOBILIZE <br />Cleanings <br />8.44 <br />Site Maintenance During Ten Year Liability Period SITEMAINT <br />ENANCE <br />800.00 <br />Pump 15 Sediment Ponds Prior to Two Cleanings PUMPING <br />236.66 <br />Clean 15 Sediment Ponds Two Times TRUCKI <br />668.30 <br />Reseed Emergency Road to Power Pole with REVEGE <br />GLMix (TR151 T002 <br />0.80 <br />Regrade ETD Pond 1 DOZER <br />0.81 <br />Replace Topsoil to Disturbance from Substations DOZER <br />0.72 <br />Re de Disturbance from Substations DOZER <br />0.51 <br />Replace Topsoil on regraded ETD Pond 1 TR104 DOZER <br />0.49 <br />Reseed Substations with Grazing Land Mix REVEGE <br />(MR142) <br />1.00 <br />Reseed Geotechnical Hole Access Corridors REVEGE <br />(MR143) <br />2.00 <br />Broadcast Seed ETD Pond 1 Area REVEGE <br />1.00 <br />Post -mining channel construction NA <br />1,120.96 <br />Collom-Haul Topsoil from TS 24A to Area 2 SCRAPERI <br />249.14 acres <br />130.94 <br />Collom-Haul Topsoil from TS 25A to Areal SCRAPERI <br />91.08 <br />Collom-Haul Topsoil from TS 24A to Area 3 SCRAPERI <br />45.14 <br />Collom-Haul Topsoil from TS 25B to Area 4 SCRAPERI <br />79.65 <br />Collom-Haul Topsoil from TS 35A to Area 6 SCRAPERI <br />211.08 <br />Collom-Haul Topsoil from TS 36A to Area 7 SCRAPERI <br />125.23 <br />Collom-Haul Topsoil from TS 35A to Area 5 SCRAPERI <br />30.58 <br />Collom-Haul Topsoil from TS 25B to Area 3 SCRAPERI <br />135.45 <br />Collom-Haul Topsoil from TS 25A to Haul Road SCRAPERI <br />181.03 <br />Collom-Haul Topsoil from TS 25A to Area 5 SCRAPERI <br />104.49 <br />Collom-Haul Topsoil from TS 25B to Area 5 SCRAPERI <br />27.26 <br />Haul Topsoil from TS 25B to Area 5 SCRAPERI <br />7.41 <br />Collom-Haul Topsoil from TS 36A to Area 5 SCRAPERI <br />77.76 <br />Haul Topsoil from TS 24A to LCX west SCRAPERI <br />33.25 <br />Collom-Haul Topsoil from TS 25A to LCX east SCRAPER] <br />34.54 <br />Collom-Haul Topsoil from TS 25A to DS pond SCRAPERI <br />11.96 <br />Demolish/dispose of facilities at Collom expansion DEMOLISH <br />area <br />60.00 <br />Rip 290,000 ft. of Collom haul road RIPPER <br />107.35 <br />v sub de 290,000 ft. of Collom haul road RIPPER <br />Scarif <br />175.22 <br />Collom-HR haul -back in balanced cut/fill areas SCRAPERI <br />Table 7 <br />343.76 <br />Collom-Scraper haul from spoil pile -road SCRAPERI <br />reclamation <br />159.89 <br />Seed & reseed 290.45 acres disturbance REVEGE <br />Shrub/Grass mix <br />290.45 <br />Seed & reseed 1161.46 acres disturbance REVEGE <br />Sagebrush/Steppe mix <br />1,161.46 <br />Collom-Rough grade 1,452.25 acres reclaimed area GRADER <br />Table 12 <br />172.10 <br />Collom-Haul topsoil from 25A to Sump area SCRAPERI <br />10.17 <br />Haul topsoil from 25A to UCWD SCRAPERI <br />0.83 <br />Little Collom Pond Removal DOZER <br />25.61 <br />Collom Sump Removal DOZER <br />620.02 <br />Re ade ditch D4 DOZER <br />2.95 <br />Re de ditch D5 DOZER <br />1.08 <br />