Laserfiche WebLink
054 <br />055 <br />057 <br />065 <br />070 <br />071 <br />072 <br />073 <br />074 <br />075 <br />076 <br />077 <br />078 <br />079 <br />080 <br />081 <br />082 <br />083 <br />084 <br />085 <br />086 <br />090 <br />091 <br />092 <br />093 <br />094 <br />095 <br />096 <br />097 <br />098 <br />099 <br />100 <br />101 <br />102 <br />103 <br />104 <br />105 <br />110 <br />111 <br />112 <br />113 <br />114 <br />115 <br />116 <br />117 <br />118 <br />119 <br />120 <br />121 <br />122 <br />123 <br />124 <br />Finish Grade Coal Stockpile Area DOZER <br />4 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1.26 <br />$2,739.00 <br />$1,199.00 <br />$5,273.00 <br />$113,736.00 <br />$8,006.00 <br />$8,899.00 <br />$20,234.00 <br />$594.00 <br />$258.00 <br />$3,349.00 <br />$1,958.00 <br />$9,948.00 <br />$463.00 <br />$34,921.00 <br />$11,212.00 <br />$5,171.00 <br />$2,023.00 <br />$14,417.00 <br />$16,894.00 <br />$12,646.00 <br />$5,564.00 <br />$7,064.00 <br />$10,468.00 <br />$2,083.00 <br />$1,770.00 <br />$937.00 <br />$898.00 <br />$3,750.00 <br />$1,667.00 <br />$2,188.00 <br />$4,167.00 <br />$1,980.00 <br />$2,292.00 <br />$2,437.00 <br />$3,434.00 <br />$53,615.00 <br />$8,087.00 <br />$18,040.00 <br />$230,857.00 <br />$77,131.00 <br />$32,596.00 <br />$127,369.00 <br />$409,026.00 <br />$75,996.00 <br />$96,167.00 <br />$34,314.00 <br />$33,387.00 <br />$443,001.00 <br />$872,982.00 <br />$103,174.00 <br />$140,588.00 <br />$2,759.00 <br />Finish Grade Gossard Loadout DOZER <br />0.55 <br />Finish Grade Reclaimed and Narrowed Roads; DOZER <br />EP,WP, STP <br />2.43 <br />Excvt Regraded Areas for PM Drng. Channels EXCAVATE <br />sub. SU & 8) <br />740.70 <br />Regrade Gulch A Pond DOZER <br />30.76 <br />Regrade Prospect Pond DOZER <br />34.19 <br />Regrade Streeter Pond DOZER <br />77.75 <br />Regrade Gossard Loop Pond DOZER <br />2.28 <br />Regrade Gossard Pond DOZER <br />0.99 <br />Regrade Sewage and Aeration Pond DOZER <br />12.87 <br />Regrade Stoker Siding Pond DOZER <br />7.52 <br />Re de Wash Bay Pond DOZER <br />38.23 <br />Regrade Wash Bay Sediment Sump DOZER <br />1.78 <br />Regrade Work Area Pond DOZER <br />134.18 <br />Regrade Section 16 Pond DOZER <br />43.08 <br />Regrade East Taylor Pond DOZER <br />19.87 <br />Regrade Taylor Pond DOZER <br />7.77 <br />Regrade West Pit Pond DOZER <br />55.40 <br />Regrade Section 28 Pond DOZER <br />64.92 <br />Regrade Section 21 Pond DOZER <br />48.59 <br />Regrade West Taylor Pond DOZER <br />21.38 <br />Remove and Regrade East Collection Ditch EXCAVATE <br />46.00 <br />Remove and Regrade South Collection Ditch EXCAVATE <br />68.17 <br />Remove and Regrade Streeter Ditch EXCAVATE <br />13.56 <br />Remove and Regrade Prospect Collection Ditch EXCAVATE <br />11.52 <br />Remove and Regrade North Facilities Ditch EXCAVATE <br />6.10 <br />Remove and Regrade Stoker Ditch EXCAVATE <br />5.85 <br />Remove and Regrade West Side Facilities Ditch EXCAVATE <br />24.42 <br />Remove and Regrade East Taylor Pond Ditch EXCAVATE <br />10.85 <br />Remove and Regrade West Pit Coal Road Ditch EXCAVATE <br />14.24 <br />Remove and Regrade Section 16 Pond Ditch EXCAVATE <br />27.13 <br />Remove and Regrade Section 16 Taylor Ditch EXCAVATE <br />12.89 <br />Remove and Regrade Section 16 Perimeter Ditch EXCAVATE <br />14.92 <br />Remove and Regrade Section 28 Collector Ditch EXCAVATE <br />15.87 <br />Remove and Regrade Section 29 Collector Ditch EXCAVATE <br />22.36 <br />Remove and Regrade Ten Sediment Traps EXCAVATE <br />349.16 <br />Remove and Regrade Six Post -Mining Stock EXCAVATE <br />Ponds <br />52.66 <br />Haul Topsoil from Pile l0A to East Pit TRUCKI <br />2.66 <br />Haul Topsoil from Pile 16A to East Pit TRUCKI <br />30.44 <br />Haul Topsoil from Pile 16B to East Pit TRUCKI <br />9.18 <br />Haul Topsoil from Pile 16B Windrow to East Pit TRUCKI <br />4.30 <br />Haul Topsoil from Pile 4A to West Pit TRUCKI <br />16.79 <br />Haul Topsoil from Pile 15B to West Pit TRUCKI <br />53.93 <br />Haul Topsoil from Pile 15K to West Pit TRUCKI <br />9.05 <br />Haul Topsoil from Pile 16A to West Pit TRUCKI <br />12.68 <br />Haul Topsoil from Pile 16E to West Pit TRUCKI <br />4.52 <br />Haul Topsoil from Windrow 5 to West Pit TRUCKI <br />4.93 <br />Haul Topsoil from Stockpile 16D to Section 16 Pit TRUCKI <br />58.41 <br />Haul Topsoil from Stockpile 16E to South Taylor TRUCKI <br />Pit <br />103.95 <br />Haul Topsoil from New Stockpile South Taylor Pit TRUCKI <br />12.29 <br />Haul Topsoil from Stockpile 15A to Facilities Area TRUCKI <br />18.54 <br />Haul Topsoil from Stockpile 15E to Facilities Area TRUCKI <br />0.41 <br />