054
<br />055
<br />057
<br />065
<br />070
<br />071
<br />072
<br />073
<br />074
<br />075
<br />076
<br />077
<br />078
<br />079
<br />080
<br />081
<br />082
<br />083
<br />084
<br />085
<br />086
<br />090
<br />091
<br />092
<br />093
<br />094
<br />095
<br />096
<br />097
<br />098
<br />099
<br />100
<br />101
<br />102
<br />103
<br />104
<br />105
<br />110
<br />111
<br />112
<br />113
<br />114
<br />115
<br />116
<br />117
<br />118
<br />119
<br />120
<br />121
<br />122
<br />123
<br />124
<br />Finish Grade Coal Stockpile Area DOZER
<br />4
<br />4
<br />4
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />1.26
<br />$2,739.00
<br />$1,199.00
<br />$5,273.00
<br />$113,736.00
<br />$8,006.00
<br />$8,899.00
<br />$20,234.00
<br />$594.00
<br />$258.00
<br />$3,349.00
<br />$1,958.00
<br />$9,948.00
<br />$463.00
<br />$34,921.00
<br />$11,212.00
<br />$5,171.00
<br />$2,023.00
<br />$14,417.00
<br />$16,894.00
<br />$12,646.00
<br />$5,564.00
<br />$7,064.00
<br />$10,468.00
<br />$2,083.00
<br />$1,770.00
<br />$937.00
<br />$898.00
<br />$3,750.00
<br />$1,667.00
<br />$2,188.00
<br />$4,167.00
<br />$1,980.00
<br />$2,292.00
<br />$2,437.00
<br />$3,434.00
<br />$53,615.00
<br />$8,087.00
<br />$18,040.00
<br />$230,857.00
<br />$77,131.00
<br />$32,596.00
<br />$127,369.00
<br />$409,026.00
<br />$75,996.00
<br />$96,167.00
<br />$34,314.00
<br />$33,387.00
<br />$443,001.00
<br />$872,982.00
<br />$103,174.00
<br />$140,588.00
<br />$2,759.00
<br />Finish Grade Gossard Loadout DOZER
<br />0.55
<br />Finish Grade Reclaimed and Narrowed Roads; DOZER
<br />EP,WP, STP
<br />2.43
<br />Excvt Regraded Areas for PM Drng. Channels EXCAVATE
<br />sub. SU & 8)
<br />740.70
<br />Regrade Gulch A Pond DOZER
<br />30.76
<br />Regrade Prospect Pond DOZER
<br />34.19
<br />Regrade Streeter Pond DOZER
<br />77.75
<br />Regrade Gossard Loop Pond DOZER
<br />2.28
<br />Regrade Gossard Pond DOZER
<br />0.99
<br />Regrade Sewage and Aeration Pond DOZER
<br />12.87
<br />Regrade Stoker Siding Pond DOZER
<br />7.52
<br />Re de Wash Bay Pond DOZER
<br />38.23
<br />Regrade Wash Bay Sediment Sump DOZER
<br />1.78
<br />Regrade Work Area Pond DOZER
<br />134.18
<br />Regrade Section 16 Pond DOZER
<br />43.08
<br />Regrade East Taylor Pond DOZER
<br />19.87
<br />Regrade Taylor Pond DOZER
<br />7.77
<br />Regrade West Pit Pond DOZER
<br />55.40
<br />Regrade Section 28 Pond DOZER
<br />64.92
<br />Regrade Section 21 Pond DOZER
<br />48.59
<br />Regrade West Taylor Pond DOZER
<br />21.38
<br />Remove and Regrade East Collection Ditch EXCAVATE
<br />46.00
<br />Remove and Regrade South Collection Ditch EXCAVATE
<br />68.17
<br />Remove and Regrade Streeter Ditch EXCAVATE
<br />13.56
<br />Remove and Regrade Prospect Collection Ditch EXCAVATE
<br />11.52
<br />Remove and Regrade North Facilities Ditch EXCAVATE
<br />6.10
<br />Remove and Regrade Stoker Ditch EXCAVATE
<br />5.85
<br />Remove and Regrade West Side Facilities Ditch EXCAVATE
<br />24.42
<br />Remove and Regrade East Taylor Pond Ditch EXCAVATE
<br />10.85
<br />Remove and Regrade West Pit Coal Road Ditch EXCAVATE
<br />14.24
<br />Remove and Regrade Section 16 Pond Ditch EXCAVATE
<br />27.13
<br />Remove and Regrade Section 16 Taylor Ditch EXCAVATE
<br />12.89
<br />Remove and Regrade Section 16 Perimeter Ditch EXCAVATE
<br />14.92
<br />Remove and Regrade Section 28 Collector Ditch EXCAVATE
<br />15.87
<br />Remove and Regrade Section 29 Collector Ditch EXCAVATE
<br />22.36
<br />Remove and Regrade Ten Sediment Traps EXCAVATE
<br />349.16
<br />Remove and Regrade Six Post -Mining Stock EXCAVATE
<br />Ponds
<br />52.66
<br />Haul Topsoil from Pile l0A to East Pit TRUCKI
<br />2.66
<br />Haul Topsoil from Pile 16A to East Pit TRUCKI
<br />30.44
<br />Haul Topsoil from Pile 16B to East Pit TRUCKI
<br />9.18
<br />Haul Topsoil from Pile 16B Windrow to East Pit TRUCKI
<br />4.30
<br />Haul Topsoil from Pile 4A to West Pit TRUCKI
<br />16.79
<br />Haul Topsoil from Pile 15B to West Pit TRUCKI
<br />53.93
<br />Haul Topsoil from Pile 15K to West Pit TRUCKI
<br />9.05
<br />Haul Topsoil from Pile 16A to West Pit TRUCKI
<br />12.68
<br />Haul Topsoil from Pile 16E to West Pit TRUCKI
<br />4.52
<br />Haul Topsoil from Windrow 5 to West Pit TRUCKI
<br />4.93
<br />Haul Topsoil from Stockpile 16D to Section 16 Pit TRUCKI
<br />58.41
<br />Haul Topsoil from Stockpile 16E to South Taylor TRUCKI
<br />Pit
<br />103.95
<br />Haul Topsoil from New Stockpile South Taylor Pit TRUCKI
<br />12.29
<br />Haul Topsoil from Stockpile 15A to Facilities Area TRUCKI
<br />18.54
<br />Haul Topsoil from Stockpile 15E to Facilities Area TRUCKI
<br />0.41