Laserfiche WebLink
BULLDOZER WORK <br />Task description: Doze Remaining East Pit Spoil (subtract SL6, SL7 & SL8 vol.) <br />Site: Colowyo Coal Mine Permit Action: MT7 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 005 <br />Date: 3/21/2016 <br />User: JHB <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat DI IT - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C019-005 <br />MATERIAL QUANTITIES <br />Initial Volume: 144,777 <br />Swell factor: 1.000 <br />Loose volume: 144,777 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />285 feet <br />1,115.6 LCY/hr <br />Partly consolidated stockpile 1.1 <br />-10% <br />7,600 feet <br />2,572 lbs/LCY <br />User Provided <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 (AB.AVG <br />Utilization % <br />Ownership Cost/Hour: <br />$194.10 <br />NA <br />Operating Cost/Hour: <br />$291.79 <br />100 <br />Ripper op. Cost/Hour: <br />$16.70 <br />100 <br />Operator Cost/Hour: <br />$38.89 <br />NA <br />Total unit Cost/Hour: <br />$541.47 <br />Total Fleet Cost/Hour: <br />$2,165.89 <br />MATERIAL QUANTITIES <br />Initial Volume: 144,777 <br />Swell factor: 1.000 <br />Loose volume: 144,777 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />285 feet <br />1,115.6 LCY/hr <br />Partly consolidated stockpile 1.1 <br />-10% <br />7,600 feet <br />2,572 lbs/LCY <br />User Provided <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 (AB.AVG <br />