Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 013 Page 2 of 2 <br />Job efficiency: <br />0.83C <br />Spoil pile: <br />0.80C <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.868 <br />Blade type: <br />1.000 <br />Net correction: 0.3890 <br />Adjusted unit production: 354.18 LCY/hr <br />Adjusted fleet production: 354.18 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.648/LCY <br />Total job time: 18.11 Hours <br />Total job cost: $4,158 <br />(1 SHIFT/DAY) <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />