Laserfiche WebLink
EXHIBIT 13C <br />Collom Haul Road <br />Tables 13C-1 through 13C-6 present required items and associated volumetrics to reclaim the <br />Collom Haul Road. Map 25E Sheet 1 presents the locations that will be required to be reclaimed <br />for the Collom Haul Road and all culvert locations <br />Table 13C-1 Volume of Asphalt (Removed) for the Collom Haul Road <br />Length (ft) x Width (ft) x Depth (in) I Volume (CYD) <br />Asphalt <br />29,458 x 28 x 7 <br />17,820 <br />Table 13C-2 Asphalt Ripping Requirements for the Collom Haul Road <br />Width (ft) Length (ft) I Area (acres) <br />28 1 29,458 1 18.9 <br />Volume 20 Page 3 Revision Date: 12/30/16 <br />Revision No.: TR -108 <br />