Laserfiche WebLink
EXHIBIT 13C <br />CUMULATIVE BOND SCHEDULE <br />Introduction <br />In accordance with Rules 3.02.1(5)(b) and 3.02.1(6), Exhibit 13C presents a cumulative bond <br />schedule for the reclamation of the Collom Haul Road, the Collom facilities area, the primary <br />sediment control structures, and raw water pipeline. Each specific part can be found on the pages <br />listed below. <br />Table of Contents <br />CollomHaul Road...........................................................................................................................3 <br />Table 13C-1 Volume of Asphalt (Removed) for the Collom Haul Road....................................3 <br />Table 13C-2 Asphalt Ripping Requirements for the Collom Haul Road....................................3 <br />Table 13C-3 List of Culverts for the Collom Haul Road.............................................................4 <br />Table 13C-4 Regrade Volumes for Collom Haul Road...............................................................5 <br />Table 13C-5 Topsoil Replacement for Collom Haul Road..........................................................5 <br />Table 13C-6 Revegetation Requirements for Collom Haul Road...............................................5 <br />CollomFacilities Area.....................................................................................................................6 <br />Table 13C-7 Regrade Volumes for the Collom Facilities Area...................................................6 <br />Table 13C-8 List of Culverts for the Collom Facilities...............................................................6 <br />Table 13C-9 Topsoil Volumes for the Collom Facilities Area....................................................6 <br />Table 13C-10 Collom Primary Crusher Demolition*..................................................................7 <br />Table 13C-11 Concrete Demolition.............................................................................................7 <br />Table 13C-12 Blasters Building...................................................................................................7 <br />Primary Sediment Control Structures..............................................................................................8 <br />Table 13C-13 Regrade Volumes for Sediment Ponds.................................................................8 <br />Table 13C-14 Topsoil Volumes for Sediment Ponds..................................................................9 <br />Table 13C-15 Perimeter Ditch Regrade and Topsoil Requirements...........................................9 <br />CollomAccess Roads....................................................................................................................10 <br />Table 13C-16 Access Roads Topsoil Replacement...................................................................10 <br />Table 13C-17 Access Roads Revegetation Requirements.........................................................10 <br />Pump House Building and Raw Water Pipeline............................................................................11 <br />Table 13C-18 Raw Water Pump Building Requirements..........................................................1 <br />l <br />Table 13C-19 Topsoil Requirements for Raw Water Pipeline*................................................11 <br />Volume 20 Page 1 Revision Date: 12/30/16 <br />Revision No.: TR -108 <br />