Laserfiche WebLink
SEDCAD 4 for Windows <br />Structure #46 (Null, <br />Null above Coal Stockpile Pond <br />Null <br />Structure #45 (8ond1 <br />Coal Stockpile Pond <br />Pond Inputs: <br />Pond Results: <br />Initial Pool Elev: <br />Stability Stability <br />Class D w/o Class D w/ <br />Freeboard Freeboard <br />Capacity Capacity <br />Class B w/o Class B w/ <br />Freeboard Freeboard <br />Design Discharge: <br />33.10 cls <br />33.10 cfs <br />Depth: <br />0.64 ft <br />1.04 ft <br />Top Width: <br />14.56 ft <br />16.18 ft <br />Velocity: <br />3.89 fps <br />2.25 fps <br />X -Section Area: <br />8.51 sq ft <br />14.71 sq ft <br />Hydraulic Radius: <br />0.573 ft <br />0.882 ft <br />Froude Number: <br />0.90 <br />0.42 <br />Roughness Coefficient: <br />0.0457 <br />0.1054 <br />Structure #46 (Null, <br />Null above Coal Stockpile Pond <br />Null <br />Structure #45 (8ond1 <br />Coal Stockpile Pond <br />Pond Inputs: <br />Pond Results: <br />Initial Pool Elev: <br />7,214.80 ft <br />Initial Pool: <br />4.58 ac -ft <br />*Sediment Storage: <br />0.00 ac -ft <br />Dead Space: <br />0.00% <br />*No sediment capacity defined <br />Emergency Spillway <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />7,218.00 20.00 3.00:1 3.00:1 20.00 <br />Peak Bevation: <br />7,218.01 ft <br />H'graph Detention Time: <br />9.23 hrs <br />Pond Model: <br />CSTRS <br />Dewater Time: <br />0.04 days <br />Trap Efficiency: <br />100.00 <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation -Capacity -Discharge Table <br />11 <br />Filename Eastside Initial Disturb 1024 022317.sc4 Printed 02-24-2017 <br />Exh. 7-23J-16 Revision Date: 02/26/2017 <br />Revision No.: TR -108 <br />