My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-20_PERMIT FILE - C1981019A (21)
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2017-03-20_PERMIT FILE - C1981019A (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 8:37:40 AM
Creation date
8/15/2017 9:29:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
3/20/2017
Doc Name
Sediment Pond Access Roads
Section_Exhibit Name
Volume 18 Exhibit 7 Item 23 Part D
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 7, ITEM 23, PART D <br />SEDIMENT POND ACCESS ROADS AND OTHER ACCESS ROADS <br />This section addresses the design and construction of the access roads used to build, operate, and <br />maintain the sediment ponds presented in Exhibit 7-23, Part B. Specifically Exh. 7-23, Figure <br />Dl, provides design details for the two roads on the West Side, and Exh. 7-23, Figure D2 <br />provides the same information for the three roads on the East Side. <br />Similarly, Exh. 7-23 Figures D3 and D4 provide design information for the Facilities Access <br />Road and Exh. 7-23 Figure D5 provides design details for the Jubb Creek Access Road. <br />All access roads are designed to meet the requirements of Rule 4.03.2(3)(d) for cut slopes. <br />Conditions may vary in the strata horizons of the cut areas encountered during construction of <br />the access roads. Therefore, any valley fill, clay or residuum shale and mudstone deposits cut <br />slopes will be no steeper than 2H: IV. All sandstones cut slopes will be no steeper than <br />0.2514:1 V and weathered shale cut slopes no steeper than 1 H:1 V. <br />Upon completion of each road, a certified report and as -built map will be completed and <br />submitted to CDRMS for each road. <br />Exh. 7-23D-1 Revision Date: 3/3/17 <br />Revision No.: TR -108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.