Part D, Sediment Pond Access Roads and Other Access Roads
<br />IntroductoryText......................................................................................................... Exh. 7-23D-1
<br />Exh. 7-23, Figure Dl, West Side Pond Access Roads
<br />Exh. 7-23, Figure D2, East Side Pond Access Roads
<br />Exh. 7-23, Figure D3, Facility Access Road, Eastern Portion
<br />Exh. 7-23, Figure D4, Facility Access Road, Western Portion
<br />Exh. 7-23, Figure D5, Jubb Creek Access Road
<br />Part E, Sediment Control for Topsoil Stockpiles
<br />Introductory Text, Topsoil Stockpiles......................................................................... Exh. 7-23E-1
<br />SEDCAD Results, Topsoil Stockpile Ring Ditch/Berm, 10 Year, 24 Hour Event ..... Exh. 7-23E-2
<br />SEDCAD Results, Topsoil Stockpile Ring Ditch/Berm, 10 Year, 24 Hour Event ..... Exh. 7-23E-3
<br />Part F, Geotechnical Investigations, Collom Sediment Ponds
<br />IntroductoryText......................................................................................................... Exh. 7-23F-1
<br />Part G, Small Area Exemption
<br />IntroductoryText......................................................................................................... Exh. 7-23G-1
<br />SEDCAD Results, Vegetative Filter 600 ft wide x 20 ft long.....................................Exh. 7-23G-4
<br />SEDCAD Results, Vegetative Filter 600 ft wide x 70 ft long...................................Exh. 7-23G-12
<br />SEDCAD Results, Vegetative Filter 1,200 ft wide x 70 ft long................................Exh. 7-23G-20
<br />Part H, Perimeter Area Sediment Control
<br />IntroductoryText......................................................................................................... Exh. 7-231-1-1
<br />SEDCAD model for Generic Triangular Ditch, 10 Year, 24 Hour .............................Exh. 7-231-1-5
<br />SEDCAD model for Generic Trapezoidal Ditch, 10 Year, 24 Hour .........................Exh. 7-23H-11
<br />SEDCAD model for l 00x 100 area thru 20x 100 grass filter, 10 Year, 24 Hour....... Exh. 7-231-1-17
<br />SEDCAD model for l 00x 1000 area thru 20x1000 grass filter, 10 Year, 24 Hour... Exh. 7-231-1-24
<br />SEDCAD model for 300x1000 area thru 20x1000 grass filter, 10 Year, 24 Hour... Exh. 7-231-1-31
<br />Part I, Sediment Control System Analysis at End of Mining
<br />IntroductoryText.......................................................................................................... Exh. 7-23I-1
<br />Exh. 7-23, Figure I1, Profile Along Little Collom and Bear Draw .............................. Exh. 7-23I-7
<br />Exh. 7-23, Figure I2, East Side SEDCAD Networking Schematic Diagram ............... Exh. 7-23I-8
<br />SEDCAD model for West Side, 10 Year, 24 Hour ...................................................... Exh. 7-23I-9
<br />SEDCAD model for West Side, 100 Year, 24 Hour .................................................. Exh. 7-23I-30
<br />SEDCAD model for East Side, 10 Year, 24 Hour ...................................................... Exh. 7-23I-45
<br />SEDCAD model for East Side, 100 Year, 24 Hour .................................................. Exh. 7-23I-106
<br />Part J, Sediment Control System For Initial Facilities Disturbance Area
<br />IntroductoryText..........................................................................................................Exh. 7-23J-1
<br />Exh. 7-23, Figure J1, East Side Model, Initial Disturbance ......................................... Exh. 7-23J-4
<br />Exh. 7-23, Figure J2, Coal Stockpile Pond Design Information .................................. Exh. 7-23J-5
<br />SEDCAD model for Initial Disturbance with Pond Included, 10 Year, 24 Hour ........ Exh. 7-23J-6
<br />SEDCAD model for Initial Disturbance with Pond Reduced, 10 Year, 24 Hour ...... Exh. 7-23J-32
<br />SEDCAD model for East Side Initial Disturbance, 25 Year, 24 Hour ....................... Exh. 7-23J-58
<br />Exh. 7 -23 -ii Revision Date: 12/30/16
<br />Revision No.: TR -108
<br />
|