on the north bank of Poudre Ponds. The amount of water captured will depend on the pre-inflow <br /> water storage volume of Poudre Ponds with more water capture when the pond is near empty. <br /> The flood waters will be temporarily retained within the Poudre Ponds pool area, and any water <br /> captured in excess of the facility's water rights will be returned to the Cache la Poudre River <br /> channel, through an existing pump station at Poudre Ponds when water levels within the river <br /> recede. <br /> Project construction will require temporary re-routing of the Poudre River Trail along the west, <br /> south, and east sides of Poudre Ponds. Construction access for the project will be along the <br /> existing access road (adjacent to 35th Avenue) and the existing concrete Poudre River Trail. <br /> Areas outside the constructed spillway will be returned to a topography that blends with the <br /> surrounding banks of Poudre Ponds. Topsoil removed and stored from the project site will be <br /> replaced and blended to the levels of the spillway structure. The non-spillway areas will be <br /> reseeded to the approved reclamation seed mix. The upland grass mix will be used on the top of <br /> the bank, and the wetland transition grass seed mix will be used on the bank slopes. <br /> Other Permits <br /> The following agencies have issued, or may need to issue, additional permits prior to <br /> commencement of the proposed construction. The respective agency is identified, as is the type <br /> of permit, and the authority and actions granted by the permit. The following permits reflect only <br /> those needed for the proposed construction project. <br /> City of Greeley Floodplain Permit: Poudre Ponds is located within the 100-year floodplain of <br /> the Cache la Poudre River. The project is being designed to comply with floodplain regulations, <br /> and a City of Greeley floodplain pen-nit will be acquired for this project. <br /> The U.S. Army Corps of Engineers have reviewed the project and have issued a letter verifying <br /> that the project is located in non jurisdictional areas and that a Department of the Army pen-nit <br /> will not be required. <br /> Project Schedule <br /> The project is anticipated to start in March 2018 and be completed by September 2018. <br /> Maintenance <br /> Maintenance of the proposed structure will be undertaken by the City of Greeley as part of <br /> continuing operations at Poudre Ponds. <br /> The City of Greeley wants to construct erosion protection measures to protect its infrastructure <br /> from future erosion related damage. To facilitate this work, the City of Greeley is requesting a <br /> technical revision to revise the 25th Avenue Site Regular 112 Operation Reclamation Pen-nit <br /> Number M-2002-020 Reclamation Plan. <br /> 3 <br />