My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-14_REPORT - M1982129 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1982129
>
2017-08-14_REPORT - M1982129 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2017 7:50:40 AM
Creation date
8/15/2017 7:30:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982129
IBM Index Class Name
REPORT
Doc Date
8/14/2017
Doc Name
Annual Fee/Report/Map
From
L. Otto Goemmer
To
DRMS
Annual Report Year
2015
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> 12. Total acres in various stages of reclamation,since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ w/topsoil mulched w/ <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: fertilized w/ replacement rate(tons/ac): <br /> apvd fertilizer: depth(in.): <br /> Seed ' 1 1 . Fertilizer Mulch <br /> application de C�S� application application <br /> method: method: method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? C.q1 NO N/A <br /> If"YES",indicate the weed species,control area,control type,application rate and treatment date on the report map. <br /> 14. Is adequate topsoil reserved for reclamation,based on your approved permit? 0 NO N/A <br /> If"NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? 'YES NO N/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the State <br /> Engineer(Well Permit, S.W.S.P.,and/or Permanent Augmentation Plan)? �Y`ES� NO N/A <br /> 17. Are all hazardous materials stored within approved spill containment structures? ! <br />
The URL can be used to link to this page
Your browser does not support the video tag.