Laserfiche WebLink
' RECEIVED <br /> ,�, ASPHALT AUG 1112017 <br /> DIWI!'` '_ WATION <br /> SPECIALTIES CO . _iWSAFETY <br /> 10100 Dallas St. • Henderson, CO 80640 • (303)289-8555 • Fax: (720)289-7707 <br /> August 3, 2017 <br /> Mr. Eric Scott <br /> Environmental Protection Specialist <br /> Colorado Div. of Reclamation, Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> RE: Request for Fourth Extension of Time to Ad4ms Partial Adequacy Review Comments for Chavers <br /> Mining Resource DRMS Permit No. M-2015-03 AM- <br /> Dear Mr. Scott: <br /> I am officially requesting that Asphalt Specialties Co., Inc. (ASCI), the applicant for the referenced permit <br /> amendment, be granted a fourth extension of time to effectively address several minor and one major adequacy <br /> review issues from your Dec. 29, 2016 preliminary adequacy review and June 13, 2017 second adequacy review <br /> of the referenced application package. The slope stability study for approval from CDOT to mine within 200 ft. <br /> of their erosion control dikes on the Bradley property was approved by the technical reviewer on July 31, 2017 <br /> and we are awaiting approval from the Chief of Materials Engineering for CDOT Region 4 as he may have <br /> other stipulations for the setback. Given this and the remaining issues in your June 13 adequacy review and the <br /> site pre-op inspection, I feel that we may not make the decision date of August 10, 2017. <br /> ASCI is requesting another 30-day extension of time from the original decision date of March 16, 2017 to <br /> September 11, 2017 in order to complete the adequacy review approval process. I am certain we can get this all <br /> wrapped-up significantly sooner than that date, but this way we are assured of enough time. I am also including <br /> some minor revisions to the mine plan, Ex. C-2, as you had requested, showing the location of recycling and a <br /> couple, of other items (topsoil pile and sedimentation ponds). No changes are being made to the actual mining <br /> perimeter and cells-timing. <br /> Please contact me for a confirmation of the new decision date and if there are any questions or concerns you <br /> may have with this request for the added time extension. <br /> Sincerel , <br /> � 7� <br /> Rob Laird <br /> Resource Manager <br /> cc: file <br />