Laserfiche WebLink
3.3.6 Other Reclamation <br />The main facilities area has been approved for Industrial/Commercial use at the site, the <br />Permanent Dugout Pond, Permanent Sediment Pond 2, and associated diversion/drainage <br />ditches. Facilities to be demolished include the explosive storage facilities, and monitoring wells <br />(PAP, Section 2.05.3). <br />Pit highwalls were graded into the pit backfill between January and February of 2017. <br />3.3.7 Water Rights and Usage <br />Two wells are permitted on the site (PAP, Section 2.03.10, page 31). <br />