My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-11_REVISION - C1981008 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2017-08-11_REVISION - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2017 8:55:49 AM
Creation date
8/11/2017 11:06:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
8/11/2017
Doc Name
Adequacy Review
From
Robin Reilley
To
Brock Bowles
Type & Sequence
TR80
Email Name
RAR
DIH
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Horizon TR 80 Permanent Culverts <br />Rules 4.03.1 and 4.03.2 Culverts <br />The following questions relating to permanent culverts in the New Horizon Permit originate from <br />DRMS review of the TR80 submital: <br />Table 2.05.3.0-3 Permit Area Culvert Designs, C130 — C181 and associated revised pages 35-38 <br />Average Land Slope is characterized for each of the culverts C134-137. <br />1. Please clarify, for each of the above mentioned culverts, what slope that culvert lies at and <br />include that information in the culvert descriptions. <br />2. Please also include tailwater and max headwater ft. for Culverts 134-137. <br />3. Please explain how maximum headwater elevation is arrived at. <br />Table 2.05.3(3)-3 describes culverts C130 through C181. All culverts are described as CMP <br />(corrugated metal pipe) with a specified diameter. DRMS finds that culverts 134 — 137 are <br />described individually on pages 35 through 38 as HDPE (high density polyethelene pipes). Also, <br />Bureau of Public Roads attachments (pgs 23 — 30) specify C>M> Pipe (corrugated metal pipe) <br />while revised pages submitted call out HDPE pipe. <br />4. Please clarify culvert materials for said culverts and update table 2.05.3(3)-3 as needed. <br />At this time DRMS is unable to verify pipe designs as submitted for culverts 134-137. DRMS <br />anticipates being able to verify pipe sizing once the above mentioned variables are provided. <br />New Horizon Technical Revision TR80 Prepared by: R. Reilley <br />Date: August 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.