Laserfiche WebLink
August 8, 2017 C-1992-081/Hayden Gulch Loadout JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 0 <br /> <br /> Page 2 of 4 <br /> <br /> <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />Y - Air Resource Protection <br />N - Availability of Records <br />N - Backfill & Grading <br />NA - Excess Spoil and Dev. Waste <br />NA - Explosives <br />Y - Fish & Wildlife <br />R - Hydrologic Balance <br />Y - Gen. Compliance With Mine Plan <br />NA - Other <br />NA - Processing Waste <br /> <br />R - Roads <br />Y - Reclamation Success <br />Y - Revegetation <br />NA - Subsidence <br />NA - Slides and Other Damage <br />NA - Support Facilities On-site <br />Y - Signs and Markers <br />NA - Support Facilities Not On-site <br />NA - Special Categories Of Mining <br />N - Topsoil <br /> <br /> <br />COMMENTS <br /> <br />This was a partial coal inspection of the Hayden Gulch Loadout conducted by Jason Musick of CDRMS. Miranda <br />Blomquist of Peabody Energy accompanied the inspection. The loadout site was dry and the weather was clear at <br />the time of the inspection. No activities were being conducted at the main facilities area or around the rail loop. <br />No mantainence or reclamation activities of the main facilities area, the railway, or the Tie -Across Haul Road <br />were on-going at the time of the inspection. <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, <br />4.05.6; Discharge Structures 4.05.7, 4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water <br />Monitoring 4.05.13; Surface Water Monitoring 4.05.13; Drainage – Acid and Toxic Materials 4.05.8; <br />Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> <br />The truck loop pond was holding water with no discharge noted through the primary CMP spillway and the valve <br />on the spillway was closed. The embankments were well vegetated and stable with no problems noted. The Rail <br />Loop Pond was dry at the time of the inspection, with no evidence of recent discharge noted. Embankments were <br />stable and well vegetated with no problems noted. <br /> <br />Ditches and culverts throughout the Loadout area and the Tie-Across Haul Road were stable and no problems <br />noted.