Laserfiche WebLink
Update to Reclamation Cost Estimate <br /> TR-94 will have a moderate impact on the approved reclamation cost estimates as the inclusion of existing <br /> benches in the final grading plan requires less movement of material than if the entire slope were graded to <br /> one continuous slope at 2.5H:1 V as previously proposed. <br /> CC&V used the reclamation costs from Amendment 11 submission to calculate the change in reclamation <br /> cost. Attachment 3 below contains a reclamation cost estimation to reflect the updated reclamation liability <br /> incurred by the State. Figure 1 can be used with Attachment 3 to understand assigned terms. All costs <br /> include equipment and labor. At the time of this submission the financial warranty is $207,596,201. With <br /> the approval of TR-94 the required financial warranty will decrease by $36,127,839 or what the State <br /> determines to be the change in reclamation liability. <br /> - - - ---- - <br /> ----- --------- - <br /> F —_-------- __-_—-—--------__ _-_ -__-- <br /> NE AGVLF <br /> ------------- <br /> +, <br /> --__ —_ — --___ — 1 at <br /> -- -------------- ------ <br /> ------------------------ <br /> ------------------------ <br /> -_ --_—_-_--__—__—_- <br /> SW AGVLF -- --------- - -- - -- ».. <br /> Ciukh <br /> Figure 1 —Modification of F7 drawing indicates the NE AGVLF and SW AGVLF locations. <br />