Laserfiche WebLink
Denver Field Branch <br />Bond Release Evaluation Report <br />Company: Tri-State Generation and Transmission Association, Inc. <br />Mine: Colowyo Coal Mine <br />Permit No: C-1981-019 <br />Date of Inspection: July 25, 2017 <br />Inspection Type: Phase I bond release <br />Weather: Overcast and cool, soft ground conditions <br />Operator Representative(s): Angela Aalbers and Kurtis Blunt <br />State Official(s): Zach Trujillo <br />BLM Official(s): None present <br />OSMRE Official(s): Tom Medlin (#562) <br />Background <br />This was a Phase I bond release inspection at the Colowyo Coal Mine in Meeker, Colorado. Tri- <br />state Generation and Transmission Association, Inc (Tri-State) proposes Phase I release on 129.6 <br />acres of reclamation where it indicates backfill, regrading, topsoiling, and seeding have been <br />completed in accordance with the terms of its approved permit. The Colorado Division of <br />Reclamation, Mining and Safety (DRMS) found Tri-States's SL -11 bond release application <br />administratively complete on May 15, 2017. <br />The lands proposed for release lie within the County of Moffat, State of Colorado, Township 3 <br />North, Range 93 West of the 6th PM, and are generally described as: <br />• Section 9: NW'/4 S'/2, and W1/2N '/2; <br />• Section 9: SE'/4 SE'/4; <br />• Section 10: SW'/4 SW'/4; <br />• Section 15: NW'/4 NW'/4; and <br />• Section 16: NE'/4 NE'/4. <br />Notification of the proposed bond release was posted in the Craig Daily Press for four <br />consecutive weeks, beginning February 8, 2017 and ending March 1, 2017, as well as the Rio <br />Blanco Herald Times, beginning February 9, 2017 and ending March 2, 2017. The subject <br />parcels were reclaimed in the summer and fall of 2016. The post mining land use is rangeland. <br />Tri-State currently posts a self -bond in the amount of $80,517,829 (SB -010) which covers the <br />entire mine site including the above listed area. With this application, Tri-State requests the <br />maximum bond release for Phase I, or 60% of the amount held for the subject parcel. <br />Colorado outlines the requirements for bond release at Rule 3.03.1 of the Regulations for the <br />Colorado Mined Land Reclamation Board. For Phase I, the operator must complete the <br />backfilling, regrading (which may include the replacement of topsoil), and drainage control of a <br />bonded area in accordance with the approved reclamation plan. <br />Prior to and upon conclusion of this evaluation I reviewed documents available through the <br />online permitting database maintained by DRMS including the SL -11 bond release application, <br />public notice affidavit of publication, pre and post -mining surface elevation cross-sections, and a <br />11Page <br />