Laserfiche WebLink
Cessation Order CO -2017-001 was issued on 7/12/17. The date for abatement of the violation <br />cited in the CO was fixed at 8/18/17; however, 8/18/17 is beyond the date of this Proposed <br />Assessment (7/28/17). The number of days for this Proposed Assessment will therefore be for the <br />period from the CO issuance date (7/12/17) to today (7/28/17), a total of sixteen days. <br />The Number of Days is therefore proposed at 16. <br />The Total Proposed Civil Penalty Assessment for this NOV is therefore set at $40,000. <br />