Laserfiche WebLink
w <br />Table 1.4-1. Summary of Trapper Mine SL -19 Phase II pre -mining sediment load demonstrations. <br />Table 1.4-2. Summary of Trapper Mine SL -19 Phase II post -mining sediment load demonstrations. <br />Average <br />Average <br />Slope <br />Average <br />Time <br />Representative <br />Runoff <br />Reclaimed <br />Area AMC II AMC III Erodability Control Length <br />Slope <br />of <br />Block Area <br />Volume Sediment <br />Blockacres) <br />CN CN Factor (K) Factor (C) (feet) <br />/6) <br />Concen. <br />(acres) <br />(ac -ft) (tons) <br />A,F,K&Z-AB <br />376.1 48.0 68.2 0.25 0.050 675 <br />15.3 <br />0.191 <br />20 <br />0.683 23.8 <br />2009-2013 <br />15.3 <br />0.191 <br />20 <br />1.338 9.6 <br />2009-2013 <br />Table 1.4-2. Summary of Trapper Mine SL -19 Phase II post -mining sediment load demonstrations. <br />M:\Bond Release\SL-19 (Ph2)\SL-19 Table 1.4-1 Sedcad Summary.xls <br />Average <br />Slope <br />Average <br />Time <br />Representative <br />Runoff <br />Reclaimed <br />Area AMC II AMC III Erodability Control <br />Length <br />Slope <br />of <br />Block Area <br />Volume Sediment <br />Block <br />(acres CN CN Factor (K) Factor (CP) <br />(feet) <br />(%) <br />Concen. <br />(acres) <br />(ac -ft (tons) <br />A,F,K&Z-AB <br />376.1 61.0 78.8 0.25 0.014 <br />675 <br />15.3 <br />0.191 <br />20 <br />1.338 9.6 <br />2009-2013 <br />0.009 (Modified) <br />M:\Bond Release\SL-19 (Ph2)\SL-19 Table 1.4-1 Sedcad Summary.xls <br />