Laserfiche WebLink
TRAPP21 MININD INCE <br />August 7, 2017 <br />Ms. Robin Reilley <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining & Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Dear Mr. Reilley: <br />Re: Trapper Mining Inc., Permit No. C-1981-010 <br />Phase II Bond Release Application SL -19 <br />RECEIVED <br />AUG 0 8 2017 <br />Girls "� -1 Reclamation, <br />iti,,;,,;,g & Safety <br />Enclosed please find an application for a Phase H bond release for reclaimed Trapper Mine <br />rangelands. This application contains all of the required data and information for Phase I1 bond <br />release consideration. <br />With this application package Trapper is applying for Phase H bond release on 376.1 acres of <br />land reclaimed between 2009 and 2013 in Ashmore, East Flintlock (Z), Flintlock and Kimber <br />pits. <br />The public notice submitted to the Craig Daily Press, was published on July 21 and 28, 2017 and <br />August 4 and 11, 2017. The public notice was mailed directly to surface landowners within and <br />adjacent to the permit area and to other applicable planning agencies and government entities as <br />required by regulation. Copies of the certified mail receipts are included with this <br />correspondence. The affidavit of publication for SL -19 will be submitted as soon as it is <br />available. <br />Please contact me if you have any questions regarding this correspondence. <br />Sincerely, <br />-"dL <br />Graham Roberts <br />Environmental Engineer <br />GCR/[Bond Release/SL-19/SL-19 Cover Letter.doc] <br />Encl <br />c File 109.2.3.3 <br />SL -l9 notebook <br />Jennifer Maiolo, BLM (with attachments) <br />Christine Belka , OSM (with attachments) <br />a@4D4k* in•RrifMyr► <br />P.O. Box 187 Craig, Colorado 81626 (970) 824-4401 <br />