Laserfiche WebLink
Mountain Coal Company <br />Mountain Coal Company, LLC <br />West Elk Mine <br />P.O. Box 591 <br />Somerset, CO 81434 <br />Kathleen G. Welt <br />Environmental Engineer III <br />kwelt@archcoal.com <br />phone: 970.929.2238 <br />road, where it will be tied into the existing potable water distribution pipeline. A total of <br />72' of 12" CMP culvert will be installed to accommodate the tank inlet and outlet pipelines <br />under the driveway on the east and west sides of the tank, as well as under the road to the <br />north for the outlet pipeline tie-in into the existing water distribution line. Also included will be <br />culvert C5E-64 that will be installed to route stormwater flows in the roadside ditch under the <br />tank driveway access point. <br />So that this project can be completed in the next few weeks, prior to freezing weather <br />conditions, MCC would appreciate prompt consideration of this revision application. Please <br />contact me at (970) 929-2238 or by e-mail should you have questions regarding this <br />submittal. <br />Sincerely, <br />Kathl en G. Welt, <br />Environmental Engineer III <br />cc: Weston Norris - MCC <br />Earl Quesenberry — MCC <br />Neal Starkebaum - Gunnison Co. <br />Jessica Wilczek - MCC <br />