Laserfiche WebLink
MAC WHE <br /> M-1973-021 TRO5 ' RECLAMATION, MINING AND SAFETY <br /> ✓Annual Fee/Report: Cw Denver,Colorado 80203 ph(303)866-3567 <br /> ✓Violations: <br /> MO-2012-001 <br /> MV-1993-023 7/21/1993-AB 12/21/1993 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- 1973-021 Site Name: Morrison Quarry <br /> County Jefferson TR# (DRMS Use onL) <br /> Permittee: Aggregate Industries <br /> Operator(If Other than Permittee): Aggregate Industries <br /> --CE ED .— <br /> Permittee Representative: GEI Consultants, Inc. <br /> AUG 00H17 <br /> Please provide a brief description of the proposed revision: _ <br /> DNISlON bFREDCAWATIQN <br /> Change South Quarry highwall and bench configuration and geometry. MINING AND SAFETY <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted (mark only one) <br /> 11 Oc, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(l,2 or 3) $1006 �J <br />