Laserfiche WebLink
36 <br /> Tuttle Draw POND 009� I� A 1 <br /> P N 13 PON �` r/ <br /> CO <br /> i <br /> oND 015 Tuttle Draw <br /> Enstrom <br /> Draw <br /> 'S< <br /> = Y <br /> i <br /> BB ROAD T N <br /> CD <br /> , <br /> a , <br /> � R _ <br /> 1 <br /> M <br /> , r v <br /> i <br /> i <br /> III€€I <br /> 'I <br /> POND 008 <br /> O <br /> K r <br /> NJ , <br /> - Oaf <br /> I � l <br /> 5TH ST ET <br /> -4 <br /> W <br /> a <br /> 0alamity �r ' <br /> i <br /> I <br /> RE IVED�' <br /> tad AUG 0 7 2017 <br /> 0 <br /> Division of Reciamation, <br /> Mining&Safety <br /> LEGEND <br /> SL-20 <br /> PERMIT BOUNDARY Phase 11 & Ill Bond Re/ease Area <br /> SECTION LINE PHASE II PREVIOUSLY APPROVED N <br /> SCALE: 1" = 400' <br /> ROADS ORIGINAL DATE: 5/31/17 <br /> PHASE III PREVIOUSLY APPROVED DWG. BY Tony <br /> STREAMS -y W APPROVED BY: FF <br /> W li�+ Zy ��? DWG NO. <br /> OF?IZO <br /> New Horizon Mine Map 1 <br /> Permit No. C-1981-008 <br /> ME P NDS <br /> P.O Box 626,Nucla, CO.81424 <br /> s, No. REVISION DATE BY CHK <br /> r <br /> 01 <br /> 1 PHASE II & 111 AREA AS APPLIED FOR 400' o' 400' aoo' <br /> PHASE l PREVIOUSLYAPPROVED CONTOUR INTERVAL 5 FT. <br /> -- PMT TOPOGRAPHY <br /> FILENAME:Map 1 Phase II and III Areas.dwg <br />