My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-07_INSPECTION - C1981019
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2017-08-07_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2017 9:24:18 AM
Creation date
8/8/2017 6:25:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
8/7/2017
Doc Name
Inspection Report
From
DRMS
To
Colowyo Coal Company LP
Inspection Date
8/1/2017
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 1, 2017 C-1981-019/Colowyo Coal Mine JHB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 0 <br /> Page 4 of 7 <br /> <br />SLIDES and DAMAGE - Rule 4.12: <br /> The area had experienced an intense thunderstorm the previous week. Damage had occurred to the Final <br />East Pit Ditch. Damage from this storm was primarily confined to this permanent drainage, in Reach 1 and Reach <br />2. Both EP2 and EP1 were holding water. The operator had pumped water from the stock tanks into the drainage <br />in order to be able to begin repairs. The South Collection Ditch had been cleaned of sediment to allow water from <br />the Final East Pit Ditch to flow freely into the South Collection Ditch to Prospect Pond. The operator had <br />regraded and pushed rock back into the easternmost (bottom) approximately 100-125 feet of channel. This repair <br />has occurred in the eastern extent of the ditch to just east of the confluence of Final East Pit Ditch and North <br />Tributary East Pit Ditch. The lower portion of ditch has been constructed in the unconsolidated East Pit backfill. <br />Water is seeping from EP1 into the drainage. The inspector discussed ideas to anchor the unconsolidated material <br />underneath the permanent drainage to attempt to reduce the potential for this type of damage to occur in the future. <br />Other suggestions included keying gabion check dams into a reconstructed drainage. The Division will continue <br />to document repairs to this area. <br /> <br /> <br />DOCUMENTS RECEIVED NA <br />OTHER (SPECIFY) NA <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection. The Division continues to evaluate <br />the construction and damage to the Final East Pit Ditch as a result of the Division’s July 28, 2017 <br />inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.