Laserfiche WebLink
July 27, 2017 C-1983-059/Terror Creek Loadout CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 0 <br /> <br /> Page 6 of 7 <br /> <br /> <br />Photo 3 : The outlet to the culvert running underneath the haul road in Diversion Ditch B. <br /> <br /> <br /> <br />Photo 4 : The sediment pond was dry during the inspection. No issues were noted. <br /> <br />