Laserfiche WebLink
PERMIT#:M-2008-082 <br /> INSPECTOR'S INITIALS: ECS <br /> INSPECTION DATE:August 1,2017 <br /> PHOTOGRAPHS <br /> t 1 <br /> e <br /> 4! k l <br /> Photo 1—view of dried pond looking SW from driveway Photo 2—view of dry pond outlet culvert. <br /> crossing at pond outlet. <br /> `K <br /> Photo 3—view of drainage channel downstream of pond Photo 4—view of dry outlet from wetland area <br /> outlet. Visible culverts are storm water discharge structures. upstream/south of the Morton permit. No surface water is <br /> currently entering the Morton permit. <br /> f . <br /> 4 4v <br /> .v. <br /> Photo 5—view of dry ditch along east side of Morton pe:•mit. Photo 6—photo looking north at small stagnant pond <br /> Hwy 85 is on the right side of the photo. immediately upstream of dried pond on east side of Hwy 85. <br /> This area receives storm water discharge from Ft.Lupton. <br /> Page 4 of 4 <br />