Laserfiche WebLink
V <br /> 1 = Golder <br /> Associates <br /> ' July 31, 2017 1772432 <br /> ' Ms. Amy Eschberger AUG 0 4 2017 <br /> Colorado Division of Reclamation Mining and Safety DIVISION OF RECLAMATION <br /> Department of Natural Resources MINING AND SAFETy <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> -7 RE: FIRST SEMI-ANNUAL EVENT 2017 GROUNDWATER SAMPLING AT THE BOETTCHER <br /> QUARRY <br /> Dear Ms. Eschberger: <br /> ' On behalf of Holcim (US) Inc., Golder Associates Inc. is pleased to submit analytical laboratory results for <br /> the first semi-annual 2017 groundwater sampling event at the Boettcher Limestone Quarry near La Porte, <br /> Colorado. Attached are Tables 1 through 7, summarizing the results, and a copy of the laboratory report. <br /> In addition to sampling wells MW-1 through MW-7, a field duplicate at MW-1 (MW-20) and a field blank <br /> (MW-15)were collected. The locations of monitoring wells MW-1 through MW-7 are presented in Figure 1. <br /> In December 2016, the Colorado Division of Reclamation Mining and Safety approved a revision to change <br /> the required groundwater monitoring frequency from quarterly to semi-annually (Revision TR07) based on <br /> evidence that the groundwater wells were not fully recharging between sampling events. Figure 2 presents <br /> a graph of the monitoring well water elevations measured during each sampling event from 2013 to present. <br /> The most recent water levels, taken in May 2017 after more than six months of recharge, are higher than <br /> the previous range of levels observed on site for wells that are purged dry prior to sampling (MW-2, MW-3, <br /> MW-4, MW-6, and MW-7), indicating more recharge, and further evidence that the groundwater wells were <br /> not fully recharging between sampling events. <br /> If you have any questions, please call the undersigned at(303) 980-0540. <br /> Sincerely, <br /> GOLDER ASSOCIATES INC. <br /> P_ . r,)q 1 <br /> Sara Harkins, PG Randy March, PE, PG <br /> ' Geologist Principal Geological Engineer <br /> Attachments: Table 1 —Summary of Monitoring Results for MW-1 <br /> Table 2—Summary of Monitoring Results for MW-2 <br /> Table 3—Summary of Monitoring Results for MW-3 <br /> Table 4—Summary of Monitoring Results for MW-4 <br /> Table 5—Summary of Monitoring Results for MW-5 <br /> Table 6—Summary of Monitoring Results for MW-6 <br /> Table 7—Summary of Monitoring Results for MW-7 <br /> Figure 1 — Location Map <br /> Figure 2—Groundwater Elevations vs. Time <br /> Attachment 1 —ACZ Laboratory Report <br /> SH/RM/rjg <br /> ' 1772432 BoeticherQuarryGMamp1 Q2017 Fn1-28Ju117 docx <br /> Golder Associates Inc. <br /> 44 Union Boulevard,Suite 300 o1' <br /> Lakewood,CO 80228 USA <br /> Tel (303)980-0540 Fax (303)985-2080 www golder com <br /> Golder Associates:Operations in Africa,Asia,Australasia,Europe,North America and South America <br /> Golder,Golder Associates and the GA globe design are trademarks of Golder Associates Corporation <br />