My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-03_REVISION - M2015030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2015030
>
2017-08-03_REVISION - M2015030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:33:32 PM
Creation date
8/4/2017 11:30:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015030
IBM Index Class Name
REVISION
Doc Date
8/3/2017
Doc Name
Extension request #4
From
Asphalt Specialties Co
To
DRMS
Type & Sequence
AM1
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1A S P 1 L to L T <br /> SPECIALTIES CO . <br /> T 00 Da1ts St • Henderson, CO 80640 . (303 i 2890555 Fax (720) 2847707 <br /> Au wt 3, 201 <br /> NO Eric Scott <br /> Environmental Protection Specialist <br /> Colorado Di%. of Reclamation. Uning and Safety, <br /> 1313 Shermmn Street. Room 215 <br /> Dcnt cr. Colorado 802113 <br /> RI:: Rey ue�t tin l ourth Extension of Tinge to Address Partial Adequacy Rey iew Comments for Chat ers <br /> 1ltnm,,, RCSOUrcc, DR:MS Permit No. %1-2015-030 ANJ-1 - -- ----- <br /> Dear NO. Scott: <br /> I am officially reyue;tin`a that Asphalt Specialties Co., Inc. (ASCI), the applicant for tilt-; referenced perirlit <br /> amendment. be (rantecl a ti)iuth c\ten :gym of time to effeeti<<1� address ;eteral minor and one major adequae% <br /> ref iett issue; from your Dec. U, 2016 preliminary adequacy ret ic" and .tune 13, 2017 second adequacy ref ie,. <br /> of the referenced application package. Ihe slope whilitt mud) fi)i' approval from C DC)f to mint: ttithin 2M) ft. <br /> of their erasion control dike,, on the I3radle,. property etas approted by the technical rctictter on July 31. i()l <br /> and we are maiting, nppru�al fi-oin the Chief of Materials EnDnecrin`a tier CDOT Region 4 as lie plat have <br /> other stipulations tier the `ethack. Giten du; mki the reinalt,in<< issues in %OUr .lunc 13 ndeyuact retie,, ami we <br /> site pre-op inspection. I tcei that ue may m; make the decision date of August 14 2017, <br /> ASC[ Is reyuc�tin<< anwhei 3i1-day euension of time Amu the original decision date of Marc 10, 2U17 to <br /> September 1 1. 201? in Order to complete the adequacy ref ic" approt al process I am certain tt e can go this all <br /> "rapped-up mgniticantlt %omwr than that date, but this "ay tte are assured of enough tinge. I am also iilcludin�a <br /> some minor ref is%N to the mine plan. Ex. 02. as you had requested. shot\mg the location of rectelin. and a <br /> couple, of OHM items (topsoil pile and sahilientahmi p )nds). W changes are being made to the actual Milling <br /> perimeter and cells-timing. <br /> Please contact me for a confirmation of the nett decision date and if them are any questhms or concerns you <br /> mat hate "ith this request for the added time extension. <br /> Sincerely, <br /> Rob Laird <br /> Renvirce Manager <br /> ce. file <br />
The URL can be used to link to this page
Your browser does not support the video tag.