My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-01_REPORT - M2004009
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2004009
>
2017-08-01_REPORT - M2004009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2017 2:04:34 PM
Creation date
8/2/2017 8:18:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004009
IBM Index Class Name
Report
Doc Date
8/1/2017
Doc Name
Annual Fee/Report/Map
From
Asphalt Specialties Co., Inc.
To
DRMS
Annual Report Year
2016
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Laboratory Testing <br />As per the CQC/QA plan, EEC personnel, during the site visit on May 24, 2017, obtained a relatively <br />undisturbed sample of the previously placed and compacted shale/siltstone bedrock material by hand <br />driving a "Shelby -tube" device approximately 12 inches into the compacted zone. This was performed <br />to obtain a relative "in -tact sample" for hydraulic conductivity testing in general accordance with ASTM <br />D 5084 Specifications. The samples were obtained at the general location of EEC Field Density Test No. <br />3 (5-24-17). Laboratory testing performed on the retrieved hydraulic conductivity sample included a <br />remolded "Flex -Wall Permeameter" test in general accordance with ASTM Specification D 5084 <br />Method A; results are shown below and are also included on the attached summary sheet. <br />Hydraulic Conductivity Test Results <br />Hydraulic Conductivity Laboratory Testing - Soil Classification <br />Sa - In Situ Dry Final Moisture Final Dry Hydraulic <br />Moisture, % ensity, PCF Content, % Density, PCF Conductivity, cm/s <br />3 - (5-24-17) 15.0 111.2 19.5 110.3 4.75 x 10-7 <br />Based on the reported field density test results and the laboratory test results as presented herein, this <br />lift within this phase of the placed and compacted shale/siltstone bedrock material generally conforms <br />to the project specifications and the CQC/QA plan dated March 12, 2013. <br />Earth Engineering Consultants, LLC <br />ASCI — Turnpike Reservoir — Erie, Colorado <br />EEC Project No. 1174016 <br />June 7, 2417 <br />Page 3 <br />We appreciate the opportunity to work with you on this project. If you have any questions concerning <br />this report, or if we can be of further service to you in any other way, please do not hesitate to contact <br />US. <br />Very truly yours, <br />Earth Enzineeri <br />27712 <br />'» <br />Consultants, LLC <br />David A. Richer, P.E. <br />Senior Geotechnical Engineer <br />cc: Asphalt Specialties Company Mr. Dan Hunt (dan(a�asphalts�ecialties.com) <br />Mr. Rob Laird (RobL(aasphaltsnecialties.com) <br />
The URL can be used to link to this page
Your browser does not support the video tag.